SourcingAI
Try for free
Powered by Made-in-China.com
Long Life Time Impact Roller
US$1.00
50 Pieces

Product profile

Customization

Available

Material

Steel

Application

Chemical Industry, Grain Transportation, Mining Transport, Power Plant, Coal Mining Industry, Cement, Harbor,etc

Structure

Ordinary Roller

Bearing Type

Double Sealed Bearing

Type

Grooved Conveyor Idler

Certificate

CE, ISO, BV, SGS, Ika, etc

Dia

60-219mm

Length

150-3500mm

Tube Material

S235jr

Shaft Material

Deep Drawn Steel C45(DIN)

Bearing

as Requested

Seal

Labyrinth Seal, Nylon 6

Waterproof and Dustproof Testing

Available

Lifetime

More Than 50000 Hours

Transport Package

Wooden Packing Case, Fumigation Before Loading

Specification

GB, ISO, Cema, DIN, JIS, etc

Trademark

Juxin

Origin

China

HS Code

8431390000

Production Capacity

5000PCS/Month

Company profile

Hebei Juxin Conveyor Engineering Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2003-05-01Nearest Port: Tianjin seaportAverage Response Time: ≤1.73hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, FCA, EXW

AI-Powered supplier vetting

SummaryHebei Juxin Conveyor Engineering Co., Ltd. is identified as a Chinese manufacturer/factory specializing in complete belt conveyor systems and components. It reports over 30 years of development, five production lines, stated output for conveyor systems, pulleys, brackets, and rollers, and exports to multiple global regions. The supplier demonstrates broad customization and ODM/OEM capabilities, documented quality-control procedures, product traceability, complaint-handling procedures, and service-capability corrective-action processes. However, the provided information does not establish formal certifications, overseas service infrastructure, recent new-product development, or sufficient evidence to assess financial strength. A trade-show participation record and OEM service for known brands provide limited evidence of market engagement and customer-related experience.
Supplier typeThe supplier is explicitly identified as a manufacturer/factory and a limited company based in Hebei, China. Its stated business focuses on complete belt conveyor systems and components, supported by dedicated design, production, quality-testing, and sales-service centers.
After-Sales capabilityThe company states that its operations include after-sales service and that it has clear, followed procedures and records for handling customer complaints. However, it reports no overseas agents, branches, warehouses, or showrooms, which limits evidence of localized overseas support.
Production capacityThe supplier reports five production lines and specified output for belt conveyor systems, pulleys, brackets, and conveyor rollers. Its production and processing center, quality-testing center, and broad export-market coverage support established manufacturing capability.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, and also provides ODM services. These statements directly demonstrate broad product-design and customization capability.

Send Inquiry

*To:Hebei Juxin Conveyor Engineering Co., Ltd.Hebei Juxin Conveyor Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Long Life Time Steel Roller

Long Life Time Steel Roller

US$1.00
50 Pieces(MOQ)
Made-in-China.com
Long Life Time Roller

Long Life Time Roller

US$1.00
50 Pieces(MOQ)
Made-in-China.com
Long Life Belt Conveyor Roller Impact Roller
Made-in-China.com