Powered by Made-in-China.com
Deepwater Offshore Wind Main Hub OEM Cast Iron Casting with Precision Machining
US$66,500.00
1-2 Pieces
US$64,600.00
3+ Pieces
Product profile
Customization
AvailableType
Chemical Hardening SandCasting Method
Thermal Gravity CastingModel NO.
WT-R04Sand Core Type
Resin Sand CoreApplication
MW Wind TurbinesMachining
CNC MachiningMaterial
IronSurface Treatment
CustomizedSurface Roughness
Based on Customer RequirementsStandard
ASMECertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008, ISO9001:2015,ISO 14001,ISO 45001:2018One-Stop Supply
Casting + MachiningNDT Method
Ut,MtMin. Temp
-40°C Impact TestedMax Capacity
60,000 Tons/YearNodularity Rate
≥90%Machining Accuracy
±0.01 mmSystem Position
Wind Turbine Rotor SystemProduct Name
Machined Rotor Hub CastingTurbine Type
Deepwater Offshore Wind Main HubOEM Service
Built to DrawingTransport Package
CustomizedSpecification
customizableTrademark
HNHJOrigin
ChinaHS Code
7308900000Production Capacity
60000 Tons/YearKey features
From casting to CNC machining, every process is completed in one factory for better quality control.
Each wind turbine hub casting is manufactured according to customer drawings, ensuring accurate interfaces and assembly compatibility.
Comprehensive inspection helps reduce quality risks before shipment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 years CertifiedNearest Port: lianyungang portAverage Response Time: ≤0.12h
About Our Factory & Business Background
AddressXiawo Town, Shangjie District , Zhengzhou, Henan, China
Plant Area30857.93 square meters
Number of Employees200
Registered Capital70,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months, 3-6 months, 6-12 months Off Season Lead Time: 1-3 months, 3-6 months, 6-12 months
Minimum Order Quantity1 set
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsAbsorption Tower, Distillation Column,Wind power equipment components
Production Lines1
Production MachinesMedium Frequency Furnace, Luosha Machine, Shot Blasting Machine, Vertical Lathe, Boring Machine, CNC Gantry, Horizontal Lathe
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1996-08-18
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:Why is machining allowance important for a wind turbine hub?
A:
Insufficient machining allowance may prevent critical surfaces from reaching the required tolerances, while excessive allowance increases machining time and cost. Proper casting process planning helps balance manufacturing efficiency and dimensional accuracy.
Q:Why do some wind projects require low-temperature ductile iron?
A:
For turbines operating in cold climates or offshore environments, low-temperature ductile iron provides better impact toughness, helping maintain structural reliability under demanding service conditions.
Q:What usually determines the manufacturing lead time?
A:
Lead time mainly depends on casting size, tooling requirements, machining scope, inspection standards, and production scheduling rather than casting alone. Confirming technical details early helps avoid delays during production.
Send Inquiry
*To:
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Wind Turbine Casting Rotor Hub Bearing Housing Main Shaft OEM Large Castings
US$2,198.00-2,690.00
1 Ton(MOQ)
Custom OEM Grey Iron Sand Casting with Ductile Iron with Factory Price
US$8,000.00-50,000.00
1 Piece(MOQ)
Custom Wind Turbine Castings Manufacturer Hub Main Shaft Monoblock Bearing Housing
US$2,268.00-2,680.00
1 Ton(MOQ)
Custom OEM Parts Sand Casting with Precision Machining Zinc Plating Services
US$0.12
100 Pieces(MOQ)
OEM Grey Iron/Ductile Iron/Sand Casting with CNC Precision Machining
US$1.00-20.00
1 Piece(MOQ)
MW-Class Wind Turbine Casting Precision Machined Parts Hub Bedplate Main Shaft Castings
US$2,698.00-3,100.00
1 Ton(MOQ)
OEM Precision Pump Body Sand Casting Gravity Casting with CNC Machining
US$1.00-5.00
1 kg(MOQ)
International Casting OEM with Precision Engineering Solutions Sand-Cast Molded Parts
US$7.58-8.89
2 Pieces(MOQ)
OEM Iron Casting/Steel Casting/Sand Casting with Precision Machining
US$1.00-20.00
1 Piece(MOQ)
OEM Densen Machinery Parts Tailored Design High-Quality Sand Precision Iron Customized Casting
US$1.00-2.00
1,000 kg(MOQ)
Cast Iron Sand Casting Parts with OEM Services Manufacturer
US$0.20-1.00
1,000 Pieces(MOQ)
Customized Sand Casting Cast Iron Bearing Seat with OEM Service
US$1.50-10.00
100 KG(MOQ)
OEM Grey Iron/Ggg35 Sand Casting Machinery Elbow Adapter Part with Flange
US$1.66-1.99
500 Pieces(MOQ)
OEM Precision Casting Supplier Machining Servcie Durable Ductile Iron Gray Iron Casting
US$2.00-8.00
1,000 Pieces(MOQ)
Cost Effective OEM Ductile Iron Sand Casting with CE Certification
US$0.99-2.99
100 Pieces(MOQ)



















