SourcingAI
Try for free
Powered by Made-in-China.com
Durable 630kVA Prefabricated Transformer Electrical Power Compact Substation with Low Load Loss
US$1,500.00-20,000.00
1 Piece

Product profile

Customization

Available

Application

Power, Electronic, Instrument, Lighting

Phase

Three

Model NO.

YB -12

Core

Core-type Transformer

Cooling Method

Dry-type Transformer

Winding Type

Multi-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC

Usage

Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer

Frequency Characteristics

Power Frequency

Shape of Core

Ring

Rated Capacity

250kVA

Low Voltage

0.4kv

Load Loss

2.76kw

Connection Group

Yyn0/Dyn11

Transport Package

Wooden Case

Specification

Customized

Origin

Liaocheng, Shandong Province, China

HS Code

8504210000

Production Capacity

5000 Pieces/Year

Key features

Unique Honeycomb Structure: Features double-layer composite shell with flame-retardant insulation for thermal and environmental protection.
Wide Capacity Range: Rated capacity spans from 200kVA to 2500kVA with flexible configurations for various power needs.
Multiple Shell Materials: Available in stainless steel, aluminum-zinc coated steel, aluminum alloy, and cold-rolled steel options.
Comprehensive Certifications: Certified with ISO9001-2000, ISO9001, and CCC standards for quality assurance.
Fast Response Time: Price quotes provided within 24 hours after receiving customer inquiries.
Low MOQ for OEM/ODM: Accepts OEM/ODM projects with a minimum order quantity of just 1 unit.
Standard Lead Time: Typical production lead time is 15 working days after advance payment confirmation.
Robust Environmental Design: Designed for altitudes up to 1000m, temperatures from -25 to +40 degrees Celsius.

Company profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤0.97h

About Our Factory & Business Background

AddressRoom 0809-1, 8th Floor, Commercial Office Building, No. 11, Huajian 1st District, North of Changjiang Road and West of Yanshan Road, Jiuzhou Street, High-tech Z
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsTransformer, Power Transformer, Switchgear, Power Distribution Transformer, Oil Immersed Transformer, Dry Type Transformer, Dry Type High Power Transformer, Distribution Transformer, Amorphous Alloy Transformer, Pad Mounted Transformer

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What are your major products?
A:
Our core products include Oil-Immersed Transformers, Dry-Type Transformers, Substation Transformers, and High & Low Voltage Switchgear.
Q:Are you a manufacturer?
A:
Yes, we are a manufacturer. Our factory is based in Liaocheng, Shandong Province.
Q:Can your product be customized?
A:
Considering differences in voltage, frequency, and other specific requirements for transformer products across different countries and regions, our products can be customized according to your needs.
Q:When can I get the price?
A:
Usually we quote within 24 hours after we get your inquiry.
Q:What about lead or shipping time?
A:
Production Lead Time: Typically 15 working days after confirming your advance payment. Note: May vary based on order complexity and quantity.

Send Inquiry

*To:Liaocheng Hengbian Electric Co., LtdLiaocheng Hengbian Electric Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like