SourcingAI
Try for free
Powered by Made-in-China.com
Seamless Welded Engine Water Radiator Replacement Kits for Xs 220-6 Medium Crawler Excavator, Quarry & Municipal Projects
US$58.00-900.00
10 Pieces
Sample price:US$50.00/piece.Request sample

Product profile

Conditions of Use

Land Use

Usage

Common Units

Output Type

AC Three Phase

Model NO.

XS 220-6

Cooling Method

Water Cooling

Installation Method

Fixed

Generator Type

Hydro Generator

Core Selling Point

Long Service Life

Mechanical Test Report

Provided

Application Scenarios

Generator Set

Connection

Flange or Thread

Video Factory Inspection

Provided

Quality

100% Tested

Transport Package

Wooden Case

Specification

1020*860*100

Trademark

hengchen

Origin

Weifang China

HS Code

8708911000

Production Capacity

100, 000 Pieces

Key features

Built by all-aluminum vacuum brazing, integrated channels boost heat dissipation and stabilize engine coolant temperature under long-term heavy-duty construction operations.
Thickened main plates and reinforced side panels enhance shock resistance, adapting to rough job sites and greatly lowering liquid leakage risks in complex environments.
Fluid-optimized inner runners enable balanced coolant circulation, prevent local overheating and effectively solve engine boiling during continuous heavy-load work.
Corrosion-proof aluminum alloy raw materials withstand mud and dust erosion, suitable for earthmoving, municipal works, quarries and various harsh working conditions.
Manufactured per OEM size standards with accurate holes and connectors, supporting direct replacement without modification and shortening equipment maintenance time.
Neatly arranged fins balance ventilation and anti-blocking performance, reduce dust accumulation, extend service life and cut frequent maintenance expenditures.

Company profile

Weifang Hengchen Power Technology Co., Ltd.
Exhibition ExperienceIn-stock CapacityFlexible CustomizationManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.19h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressWeifang, Shandong, China
Plant Area16650 square meters
Number of Employees69
Registered Capital2,100,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Pcs
Supply Chain Partners32

Our Production Capability & Technical Expertise

Main ProductsRadiator
Production Lines8
Production MachinesBend Machine, Forming machine, Laser Cutting Machine, Pressing machine, Pressing machine, Shearing machine, Welding machine
QA/QC inspectors4 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers4 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2018-05-23
Main MarketsDomestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff12
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationOthers
Cooperated with Fortune 500No

Product Q&A

Q:What manufacturing process is adopted, and can it sustain heavy-duty construction work?
A:
Adopt all-aluminum vacuum brazing integrated process with shock-resistant structure for earthmoving, quarry and other harsh working sites.
Q:Do I need to cut or modify pipes and brackets during installation?
A:
Manufactured per OEM dimensions with matched ports and holes for direct replacement without extra modification.
Q:Engine still overheats after replacement, is it caused by defective radiator?
A:
Not necessarily. High temperature may stem from fan, thermostat, coolant or blocked pipelines; full cooling system inspection is recommended.
Q:How to maintain and clean the radiator, any tips for fin maintenance?
A:
Clean with low-pressure compressed air reversely. Never spray fins directly with high-pressure water to prevent deformation.
Q:How about corrosion resistance? Will it leak quickly on muddy construction sites?
A:
Made of anti-corrosion aluminum alloy resisting mud and dust. Proper maintenance effectively delays corrosion and leakage.

Send Inquiry

*To:Weifang Hengchen Power Technology Co., Ltd.Weifang Hengchen Power Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

3801770 Piston Kit for Cummins Nta855 Engine
Made-in-China.com
Water Pump Kit Bundle for Cummins 5520883
Made-in-China.com