SourcingAI
Try for free
Powered by Made-in-China.com
E01 Wetland Pneumatic Shield Dam Lake Water Control Weir
US$600.00-1,600.00
10 Square Meters

Product profile

Customization

Available

Media

Water

Temperature

Ordinary Temperature

Model NO.

Q007

Type

Direct-acting

Material

Stainless Steel

Connection Form

Flange

Pressure

Ordinary Temperature

Actuator

Electric

Seal Surface

Parallel Gate Valve

Thread Position of Valve Rod

Outside Gate Valve

Usage

Regulation, Safety, Emptying, Drain, Flow Control

Standard

GB, DIN, BSW, ANSI

Application

Industrial Usage, Water Industrial Usage

Other Titles

Rubber Sluice

Ime of First Occurrence

The Year 1957

Maximum Height

6m

Model No.

Air Shield Dam

Surface Treatment

Zinc Plating

Transport Package

Bare Packed Delivery

Specification

5*5m Each Unit

Trademark

HY

Origin

Hebei China

Production Capacity

100 Sets Each Month

Key features

1. Environmentally friendlyand pollution-free, in line withthe direction of ecologicaldevelopment, with long-lastingvitality
Scientific and reasonable structure, safe and reliable operation
Eliminate jamming, lateral leakage, and bottom leakage, with excellent water storageand water-stopping effects
Easy operation management and extremely low operating costs
5. Unique ability to alleviate ice sheet compression, capable of storing water for operationin winter
Good comprehensive investment benefits
Safety
Environmental Protection and Energy Efficiency

Company profile

Hebei Hengyang Engineering Equipment Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoicePatents AwardedIn-stock Capacity
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressSouth District\" of High-Tech Industrial Development Zone, Jizhou District, Hengshui, Hebei, China
Plant Area47061 square meters
Number of Employees64
Registered Capital66,990,000 RMB
Terms of PaymentLC, T/T, D/P, Western Union, PayPal
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsInflatable Rubber Dam, Rubber Dam, Air Inflatable Rubber Dam, Water Inflatable Rubber Dam, River Dam, Steel River Dam, Convey Belts, Steel Bearing, Rubber Bearing
Production Lines6
Production MachinesVulcanization line, Fully automated rubber mixing production line
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2019-08-14
Main MarketsSoutheast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No

Product Q&A

Q:How does the hydraulic elevator dam operate?
A:
The back side is supported by two hydraulic cylinders at a small angle, powered by a hydraulic station. Hydraulic oil moves the cylinder rod to realize blocking and discharging flood.
Q:What is the lift time and drop time?
A:
The lifting time of a single gate is about 1min/m, and the lowering time can be adjusted in 30s-30min.
Q:Can the water be blocked at any height?
A:
Yes, the hydraulic elevator dam can achieve arbitrary dam high water retention.
Q:How does the dam work if sedimentation on top of its surface is more than 30 cm?
A:
It is designed to withstand severe mud and sand sedimentation. The dam can adjust to a vertical angle of 75 degrees to wash away sedimentation. If not fully removed, the remainder is not significant enough to affect lifting or dropping.
Q:What should be done if branches and stones are stuck in the dam?
A:
For floating objects like branches, regulation of a single dam or coordination with adjacent dams allows them to drift away. If stones are stuck between surfaces, adjusting the dam's angle releases them due to gravity and water flow.

Send Inquiry

*To:Hebei Hengyang Engineering Equipment Co., Ltd.Hebei Hengyang Engineering Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Pressure Durable Flanged Casting Ss Gate Valve
Made-in-China.com