Powered by Made-in-China.com
Durable Long Continuous Working Capacity Ride-on Concrete Trowel Satisfy Tight Construction Schedules of Large Projects
US$1,910.00
1-9 Pieces
US$1,835.00
10+ Pieces
Product profile
Customization
AvailableAfter-sales Service
1yearWarranty
1yearModel NO.
HT-100BType
Ride-on Power TrowelShotcrete Type
OtherMachining Process
HydraulicStructure
Spiral TypeProductivity
104.17-125 M2/ HFeeding Height
OtherVibrating Amplitude
OtherCertification
CECondition
NewColor
OrangeTransport Package
Wooden CaseSpecification
L2000xW1050xH1300mmTrademark
HuitengOrigin
HenanHS Code
8464209000Production Capacity
2000pieces/YearKey features
Trowel disc speed: 70~165 rpm, double efficiency
Ride-on operation with dual-disc rotary trowel structure
Thickened steel body for more stable operation
Working efficiency: 2500~3000 m2/day
Engine power: 25 hp, strong power
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 15 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.24h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 1008, Floor 10-11, East Unit 2, Building 5, No. 38 Nongke Road, Zhengzhou, Henan, China
Plant Area267 square meters
Number of Employees7
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsTamping Rammer; Ride-on Vibratory Roller; Concrete Grinder; Vibratory Plate Compactor; Concrete Road Cutter; Wall Saw Machine
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2011-04-06
Main MarketsEurope
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Product CertificationOthers
Cooperated with Fortune 500No
Product Q&A
Q:Are you original manufacture?
A:
Yes,we are a manufacturer.
Q:How can you control your product quality?
A:
Quality is always considered as the most important part during our manufacturing process. All of our products come under strict quality control system from raw material inspection, component inspecting,semi-finished product inspecting,performance test of finished products,to random inspection before delivery.
Q:How about the warranty ?
A:
We supply 12 months warranty.
Q:How can we do if there are problems with the products?
A:
Our engineers will analyze the problem for you and find the best solution. If problems happened within the guaranteed time, we can replace the components for you free of charge.
Q:What services can we provide?
A:
Accepted Delivery Terms: FOB, FCA, DAP, DDP, CFR, CIF, CIP, EXW;Accepted Payment Type:T/T, L/C, D/P, D/A ,Credit Card, Western Union, PayPal, MoneyGram, Cash.Language Spoken:English,Spanish,Portuguese,German,Arabic,French,Russian.
Send Inquiry
*To:Henan Huiteng Construction Technology Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Gasoline Engine 800 mm Working Disc Concrete Ride on Power Trowel
US$1,220.00-1,530.00
1 set(MOQ)
Long Endurance Working Ride-on Concrete Trowel Support All-Day Continuous Floor Construction
US$1,085.00-1,125.00
1 Piece(MOQ)
1910mm Working Daimeter Ride on Trowel Heavy Type Power Trowel Concrete Float Machine
US$1,800.00-4,800.00
1 Piece(MOQ)
Customizable 10-20L Fuel Tank Assembly Ride-on Concrete Power Trowel Meet Different Continuous Working Demands
US$1,835.00-1,910.00
1 Piece(MOQ)
Precision Machining Durable Concrete Machine Double Blade Complete Ride on Power Trowel
US$1,667.00-2,536.00
1 Piece(MOQ)
Durable Ride-on Concrete Trowel for Sale with Exceptional Quality
US$2,611.00-4,849.00
1 Unit(MOQ)
2320mm Working Diameter Concrete Ride on Power Trowel Gyp-846 with Overlapping Design
US$2,800.00-3,000.00
1 Piece(MOQ)
Long Endurance Working Capability Ride-on Concrete Trowel Support Full-Day Continuous Operation
US$976.00-998.00
1 Piece(MOQ)
Working Diameter 2320mm Gasoline Concrete Ride on Power Trowel Gyp-846
US$4,100.00-4,600.00
1 Piece(MOQ)
Optional 20L Large Capacity Fuel Tank Vertical Concrete Trowel Ensure Ultra-Long Endurance Working
US$2,250.00-2,328.00
1 Piece(MOQ)
Factory Direct Sales Precision Machining Durable Trowel Machine Battery Powered Ride on Power Trowel
US$1,667.00-2,536.00
1 Piece(MOQ)
Durable 36-Inch Ride-on Concrete Trowel for Smooth Surfaces
US$2,611.00-4,849.00
1 Unit(MOQ)
Concrete Ride on Power Trowel Leveling Screed Machine Supplier
US$1,800.00-4,800.00
1 Piece(MOQ)
Jm100A Hot Sale Concrete Power Trowel Gasoline Engine Machine Ride on Trowel Power
US$900.00-1,200.00
1 sets(MOQ)
High Performance Ride on Concrete Power Trowel with Global Certification
US$499.00-999.00
5 Pieces(MOQ)
High Working Efficiency Walk-Behind Power Trowel / Ride on Power Trowel
US$199.00-1,999.00
1 Piece(MOQ)
Ce High Quality Good Price Ride on Concrete Power Trowel with Construction
US$280.00-500.00
1 Piece(MOQ)
Construction Equipment Ride-on Gasoline Concrete Power Trowel (QUM-80)
US$2,549.99-3,399.99
1 Piece(MOQ)
Best-Selling Manufacturer Wholesale Gasoline Concrete Ride on Power Trowel Machine
US$2,850.00
1 Piece(MOQ)
Factory Sales Ride-on Hydraulic Gasoline Concrete Power Trowel (QUM-78H)
US$3,374.99-4,499.99
1 Piece(MOQ)



















