Powered by Made-in-China.com
Advanced Biomass Boiler Air Preheater for Enhanced Efficiency
US$213.00-245,000.00
1 Piece
Sample price:US$213.00/piece.Request sample
Product profile
Customization
AvailableCertification
CE, ISOCustomized
CustomizedModel NO.
OEMSurface Treatment
NaturalFuel
OilRange of Applications
Power station, Life, IndustrialType
Boilers HeadWorking Temperature
200-600 CWarranty Period
One YearApplication Field
Coking, Metallurgy, Waste IncinerationPlate Thickness
0.8~1.5mmTransport Package
Steel Frame Wooden BoxSpecification
customizedTrademark
TUOFANGOrigin
Henan, ChinaHS Code
8419500090Production Capacity
5000Key features
Customized Dimensions: Dimensions (L*W*H) are fully customizable to meet specific project requirements.
Wide Material Options: Available in Aluminum, Carbon Steel, Stainless Steel, Copper, Titanium, and Cu-Ni.
High Pressure Capability: Maximum working pressure of 4.5 MPa with design pressure up to 30 MPa.
OEM/ODM Services: Full customization options including logo, design, and sample-based customization.
One-Year Warranty: Comprehensive one-year warranty coverage for all mechanical equipment.
Fast Delivery: Products in stock dispatched within 15 days; bulk orders completed within 30 days.
Quality Assurance: 100% water pressure and fin welding strength pull tests performed on all products.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.12h
About Our Factory & Business Background
AddressNo. 13 Jinhui Avenue, Jinhui District, Yanling County, Xuchang City, Henan Province
Plant Area3000 square meters
Number of Employees19
Registered Capital10,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Air Cooled Heat Exchanger, Shell and Tube Heat Exchanger, Plate Heat Exchanger, Finned Tube, Radiator, Spiral Plate Heat Exchanger
Production Lines6
Production MachinesShearing machine, Laser welding machine, High-frequency sealing machine, Laser cutting machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers5 people
Traceability of Raw MaterialsNo
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2021-11-05
Main MarketsSouth Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:I haven't done business with you guys before,how can I trust your company?
A:
We have a large number of authoritative certificates, such as CE certification, ISO9001 certification, and on-site verification certificates. I hope the above content is convincing enough for you.
Q:What is the minimum order?
A:
Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we wouldbe
very likely to make the MOQ as 1 piece for you though.
Q:How can I get a sample to check your quality? How long can I get the sample?
A:
After price confirmed, FREE SAMPLE could be provided for your evaluation.After you confirm the sample details, the samples
willbe ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-13days.
Q:What payment methods your company accept?
A:
We accept T/T, L/C, Western Union, Paypal.
Q:What's the shipment terms and delivery time of your company?
A:
FOB,CFR,CIF,15-57days
Send Inquiry
*To:
Henan Tuofang Energy Saving Technology Co., Ltd.
Henan Tuofang Energy Saving Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Modular Air Preheater Skid for Industrial Efficiency
US$79.00-245,000.00
1 Piece(MOQ)
Advanced Seawater Cooling Air Preheater for Enhanced Corrosion Resistance
US$998.00-245,000.00
1 Piece(MOQ)
Advanced Technology China Manufacturer Hteg Brand Air Preheater for Boiler
US$100,000.00
1 Set(MOQ)
Premium Spiral Plate Air Preheater for Enhanced Heat Transfer Efficiency
US$59.00-245,000.00
1 Piece(MOQ)
ISO9001 Certified Air Preheater for Enhanced Boiler Performance
US$100.00-135.00
1 Set(MOQ)
Rotary Air Preheater with China Manufaturer Hteg for Biomass Boiler
US$100,000.00
1 Set(MOQ)
Custom Boiler Air Preheater for Energy Efficiency, Designed for Large-Scale Industrial Boilers
US$1,550.00-30,000.00
1 Piece(MOQ)
High Efficiency Equipment Boiler Part Air Preheater for CFB Boiler
US$100,000.00
1 Set(MOQ)
Advanced Enamel Coated Tubes Boiler Air Preheater, Provides Excellent Corrosion Resistance, Ideal for Harsh Industrial Environments
US$1,550.00-30,000.00
1 Piece(MOQ)
High-Efficiency Enameled Tube Air Preheater for Oil Boilers
US$67.00-245,000.00
1 Piece(MOQ)
Improving Thermal Efficiency Flue Gas Heat Exchanger for CFB Boiler Air Preheater
US$4,500.00-6,000.00
1 Ton(MOQ)
China High Standard Equipment Air Preheater Worked for Boiler
US$100,000.00
1 Set(MOQ)
Datang ISO9001 Stainless Steel Heat Exchanger Boiler Air Preheater for Energy Saving
US$300.00-30,000.00
1 Set(MOQ)
Datang ISO9001 Carbon Steel Heat Exchanger Boiler Air Preheater for Power Station Maintenance
US$300.00-30,000.00
1 Set(MOQ)
Boiler Air Preheaters for Energy Saving
US$1,000.00-1,800.00
1 Ton(MOQ)
High Heat Transfer Efficiency Wet Flue Gas Preheating Unit Welded Plate Type Air Preheater for Steel Refinery SCR System
US$1,000.00-250,000.00
1 Set(MOQ)
Datang ISO9001 Alloy Steel Heat Exchanger Boiler Air Preheater for Energy Saving
US$300.00-30,000.00
1 Set(MOQ)



















