Powered by Made-in-China.com
Advanced Cooling Solutions: High-Efficiency Refrigeration Heat Exchange System
US$10.00
1-9 pieces
US$1.90
10-49 pieces
US$0.80
50+ pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableWarranty
1 YearCertification
CE, ISOModel NO.
OEMApplication
Cooler, CondenserPrinciple
Mixing Heat ExchangerStyle
CustomizedMaterial
Stainless SteelIdeo Outgoing-Inspection
ProvidedWeight (Kg)
10Video Outgoing-Inspection
ProvidedMachinery Test Report
ProvidedTransport Package
Steel Frame Wooden BoxSpecification
customizedTrademark
TUOFANGOrigin
Henan, ChinaHS Code
8419500090Production Capacity
8000000Key features
Customized Dimensions: Dimensions (L*W*H) are fully customizable to meet specific project requirements.
Wide Material Options: Available in Aluminum, Carbon Steel, Stainless Steel, Copper, Titanium, and Cu-Ni.
High Pressure Capability: Maximum working pressure of 4.5 MPa with design pressure up to 30 MPa.
OEM/ODM Services: Full customization options including logo, design, and sample-based customization.
One-Year Warranty: Comprehensive one-year warranty coverage for all mechanical equipment.
Fast Delivery: Products in stock dispatched within 15 days; bulk orders completed within 30 days.
Quality Assurance: 100% water pressure and fin welding strength pull tests performed on all products.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.11h
About Our Factory & Business Background
AddressNo. 13 Jinhui Avenue, Jinhui District, Yanling County, Xuchang City, Henan Province
Plant Area3000 square meters
Number of Employees19
Registered Capital10,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Air Cooled Heat Exchanger, Shell and Tube Heat Exchanger, Plate Heat Exchanger, Finned Tube, Radiator, Spiral Plate Heat Exchanger
Production Lines6
Production MachinesShearing machine, Laser welding machine, High-frequency sealing machine, Laser cutting machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers5 people
Traceability of Raw MaterialsNo
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2021-11-05
Main MarketsSouth Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:I haven't done business with you guys before,how can I trust your company?
A:
We have a large number of authoritative certificates, such as CE certification, ISO9001 certification, and on-site verification certificates. I hope the above content is convincing enough for you.
Q:What is the minimum order?
A:
Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we wouldbe
very likely to make the MOQ as 1 piece for you though.
Q:How can I get a sample to check your quality? How long can I get the sample?
A:
After price confirmed, FREE SAMPLE could be provided for your evaluation.After you confirm the sample details, the samples
willbe ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-13days.
Q:What payment methods your company accept?
A:
We accept T/T, L/C, Western Union, Paypal.
Q:What's the shipment terms and delivery time of your company?
A:
FOB,CFR,CIF,15-57days
Send Inquiry
*To:
Henan Tuofang Energy Saving Technology Co., Ltd.
Henan Tuofang Energy Saving Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Elliptical Heat Exchange System for Maximum Efficiency
US$1.40-5.00
1 Piece(MOQ)
Innovative Refrigeration System Featuring Advanced Heat Exchange Technology
US$468.00-3,060.00
1 Piece(MOQ)
High-Efficiency Cooling Chiller System for Optimal Heat Transfer
US$468.00-3,060.00
1 Piece(MOQ)
Advanced Air Cooling System for Enhanced Performance and Efficiency
US$1.00-1,000.00
1 Piece(MOQ)
Water Cooling Coil System with Aidear's High-Efficiency Tube Design
US$199.00
1 Piece(MOQ)
High-Efficiency Stainless Steel Cooling System for Enhanced Performance
US$6.50-6.90
1 pieces(MOQ)
High-Efficiency Industrial Tubular Cooling Systems for Optimal Performance
US$130.00-420.00
1 units(MOQ)
Advanced Customizable Heat Exchange Systems for Optimal Performance
US$128.00-1,780.00
1 Piece(MOQ)
High-Efficiency Heat Transfer for HVAC Systems
US$50.00-2,000.00
1 Piece(MOQ)
Refrigeration Module Cooling Solution Compact Cooling System for Industrial Equipment
US$300.00-1,500.00
1 Set(MOQ)
High-Efficiency Radiator Heat Exchanger Shell and Tube System
US$90.00-160.00
1 units(MOQ)
Cost Effective High Efficiency Power Generation System for Chemical Factories
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
Popular Choice High Efficiency Whr Power Generation System for Chemical Factories
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
High-Performance Stainless Steel Sea Water Heat Exchange System
US$468.00-680.00
10 Pieces(MOQ)
High Efficiency Air Compressor Heat Recovery System for Heat Reuse
US$1,000.00-20,000.00
1 Piece(MOQ)
Advanced Heat Recovery System with CE Certification for Energy Efficiency
US$2,000.00-10,000.00
1 Set(MOQ)
HVAC System Hosehold High Efficiency Heat Recovery Energy Recovery Ceiling Ventilation System
US$100.00-163.00
5 Pieces(MOQ)
Advanced Energy Efficient Heat Exchange System for Galvanizing
US$2,000.00-10,000.00
1 Set(MOQ)
High-Efficiency Datang Heat Exchanger and Air Cooler System
US$10.00
10 Pieces(MOQ)
High Frequency Condenser Cooling System for European, Asian Cars
US$58.00-88.00
10 Pieces(MOQ)



















