Powered by Made-in-China.com
Advanced Spiral Heat Exchanger for Optimal Distillation Efficiency
US$113.00
1 sets
US$97.00
2-4 sets
US$52.00
5+ sets
Sample price:US$16.00/piece.Request sample
Product profile
Customization
AvailableWarranty
1 YearCertification
CE, ISOModel NO.
Finned tube heat exchangerApplication
Heat ExchangerPrinciple
Mixing Heat ExchangerStyle
Plate TypeMaterial
Stainless SteelPplication
Heavy Industry Cooling and HeatingWeight (Kg)
100Video Outgoing-Inspection
ProvidedMachinery Testreport
ProvidedYpe
Tube Heat ExchangerMaximum Working Pressure
4.5 MPaFrame Material
Galvanized, Galvanize Steel, SsFin Material
Aluminum, Copper, SsDimension(L*W*H)
CustomizedTube Material
Copper, Ss, Titanium, Cu-NiTransport Package
Steel Frame Wooden BoxSpecification
1cn*1cn*1cnTrademark
TUOFANGOrigin
Henan, ChinaHS Code
73059000Production Capacity
5000Key features
Wide Material Selection: Plates available in Aluminum, Stainless Steel, and Titanium for various environments.
Customizable Dimensions: Plate sizes range from 200mm x 600mm to 1500mm x 3000mm based on needs.
High Thermal Efficiency: Achieves 85% efficiency for gas-gas and 90% for gas-liquid applications.
Smart Control Options: Optional IoT-enabled fan speed adjustment with PID logic for optimization.
Comprehensive Certifications: Compliant with ASME, CE, ISO 9001, ISO 14001, and PED standards.
Low Noise Operation: Noise level at 60dB(A) with optional low-noise versions available.
3-Year Warranty Coverage: Includes 24/7 technical support for all mechanical equipment.
Full Customization Service: Offers full customization, sample-based, design-based, and minor adjustments.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.18h
About Our Factory & Business Background
AddressNo. 13 Jinhui Avenue, Jinhui District, Yanling County, Xuchang City, Henan Province
Plant Area3000 square meters
Number of Employees19
Registered Capital10,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Air Cooled Heat Exchanger, Shell and Tube Heat Exchanger, Plate Heat Exchanger, Finned Tube, Radiator, Spiral Plate Heat Exchanger
Production Lines6
Production MachinesShearing machine, Laser welding machine, High-frequency sealing machine, Laser cutting machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers5 people
Traceability of Raw MaterialsNo
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2021-11-05
Main MarketsSouth Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:How can I trust your company if I haven't done business with you before?
A:
Our company is a gold medal supplier with authoritative certificates such as CE, ISO9001, and on-site inspection certificates.
Q:What is the minimum order quantity?
A:
While we mainly deal with wholesale, we can set the MOQ to 1 piece if you insist on buying just one.
Q:How can I get a sample and how long does it take?
A:
Free samples are provided after price confirmation. Samples are ready in 3-7 days and arrive in 3-5 days via express.
Q:What payment methods do you accept?
A:
We accept T/T, L/C, Western Union, and Paypal.
Q:What are the shipment terms and delivery time?
A:
We offer FOB, CFR, and CIF terms with a delivery time of 15-50 days.
Send Inquiry
*To:
Henan Tuofang Energy Saving Technology Co., Ltd.
Henan Tuofang Energy Saving Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Compact Heat Exchanger for Optimal Energy Savings
US$160.00-200.00
1 Piece(MOQ)
2024 Advanced Heat Exchanger for Optimal Wood Drying Efficiency
US$100.00-500.00
1 Piece(MOQ)
Advanced Aluminum Heat Exchanger for Optimal Cooling Efficiency
US$3.09
500 kg(MOQ)
Advanced DN400 Plate Heat Exchanger for Optimal Energy Efficiency
US$190.00-200.00
1 Set(MOQ)
Advanced High-Efficiency Bulk Heat Exchangers for Optimal Cooling
US$190.00-200.00
1 Set(MOQ)
Advanced CE ISO Certified Plate Heat Exchanger for Optimal Efficiency
US$190.00-200.00
1 Set(MOQ)
Advanced Heat Exchanger for Optimal Cooling Efficiency and Performance
US$160.00-188.00
10 Pieces(MOQ)
Advanced Industrial Heat Exchanger for Optimal Hot Air Drying
US$800.00-3,000.00
2 Pieces(MOQ)
Advanced Plate Heat Exchanger for Optimal Heating and Cooling Solutions
US$56.00-70.00
5 Pieces(MOQ)
Advanced All Welded Plate Heat Exchanger for Optimal Performance
US$73.00-80.00
1 Piece(MOQ)
Advanced High Efficiency Heat Exchanger for Maximum Energy Savings
US$310.99-316.99
1 Piece(MOQ)
Advanced Cross Flate Flow Enthalpy Heat Exchanger for Optimal Performance
US$1,000.00
5 Pieces(MOQ)
Advanced Industrial Heat Exchanger for Superior Cooling Efficiency
US$399.00
10 Pieces(MOQ)
Durable Finned Tube Heat Exchanger for Optimal Refrigeration Efficiency
US$3.09
500 kg(MOQ)
Stainless Steel Spiral Wound Shell and Tube Distillation Condenser Heat Exchanger for Chemical Use
US$2,850.00-3,000.00
1 Set(MOQ)
Advanced High-Efficiency V Type Heat Exchanger for Air Conditioning
US$20.00
100 Pieces(MOQ)
Customized High-Efficiency Industrial Finned Tube Heat Exchanger for Optimal Cooling Solutions
US$9,800.00-10,000.00
1 Set(MOQ)
High-Performance Air Conditioning Coil Heat Exchanger for Optimal Efficiency
US$20.00
100 Pieces(MOQ)



















