Powered by Made-in-China.com
Industrial Welded Finned Tube Systems with Custom Concentric Reducers
US$9.90
1-99 pieces
US$2.50
100+ pieces
Product profile
Customization
AvailableWarranty
1 YearCertification
CE, ISOModel NO.
OEMApplication
Cooler, CondenserPrinciple
Mixing Heat ExchangerStyle
CustomizedMaterial
Stainless SteelIdeo Outgoing-Inspection
ProvidedWeight (Kg)
10Video Outgoing-Inspection
ProvidedType
Fin TubeMachinery Test Report
ProvidedTransport Package
Steel Frame Wooden BoxSpecification
customizedTrademark
TUOFANGOrigin
Henan, ChinaHS Code
84199090Production Capacity
8000000Key features
Customized Dimensions: Dimensions (L*W*H) are fully customizable to meet specific project requirements.
Wide Material Options: Available in Aluminum, Carbon Steel, Stainless Steel, Copper, Titanium, and Cu-Ni.
High Pressure Capability: Maximum working pressure of 4.5 MPa with design pressure up to 30 MPa.
OEM/ODM Services: Full customization options including logo, design, and sample-based customization.
One-Year Warranty: Comprehensive one-year warranty coverage for all mechanical equipment.
Fast Delivery: Products in stock dispatched within 15 days; bulk orders completed within 30 days.
Quality Assurance: 100% water pressure and fin welding strength pull tests performed on all products.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.16h
About Our Factory & Business Background
AddressNo. 13 Jinhui Avenue, Jinhui District, Yanling County, Xuchang City, Henan Province
Plant Area3000 square meters
Number of Employees19
Registered Capital10,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Air Cooled Heat Exchanger, Shell and Tube Heat Exchanger, Plate Heat Exchanger, Finned Tube, Radiator, Spiral Plate Heat Exchanger
Production Lines6
Production MachinesShearing machine, Laser welding machine, High-frequency sealing machine, Laser cutting machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers5 people
Traceability of Raw MaterialsNo
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2021-11-05
Main MarketsSouth Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:I haven't done business with you guys before,how can I trust your company?
A:
We have a large number of authoritative certificates, such as CE certification, ISO9001 certification, and on-site verification certificates. I hope the above content is convincing enough for you.
Q:What is the minimum order?
A:
Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we wouldbe
very likely to make the MOQ as 1 piece for you though.
Q:How can I get a sample to check your quality? How long can I get the sample?
A:
After price confirmed, FREE SAMPLE could be provided for your evaluation.After you confirm the sample details, the samples
willbe ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-13days.
Q:What payment methods your company accept?
A:
We accept T/T, L/C, Western Union, Paypal.
Q:What's the shipment terms and delivery time of your company?
A:
FOB,CFR,CIF,15-57days
Send Inquiry
*To:
Henan Tuofang Energy Saving Technology Co., Ltd.
Henan Tuofang Energy Saving Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Ceiling Mounted Jet Unit System for Industrial Ventilation with Adjustable Nozzle
US$500.00
1 Piece(MOQ)
3 Tph Evaporative Crystallization System with Industrial Standards, 380V 3 Phase
US$6,100.00-94,500.00
1 Piece(MOQ)
Custom 1 to 10 Kw Cooling Capacity Car Battery with Liquid Cooing System
US$300.00-800.00
1 Piece(MOQ)
Industrial Wastewater LTE Treatment System with 5000 Gpd Capacity
US$6,500.00-649,800.00
1 Piece(MOQ)
304 Stainless Steel Mvr Rectification System with PLC Control for Industrial Wastewater
US$420.00-85,900.00
1 Piece(MOQ)
Factory Price Battery Thermal Management System with Ec Certificate
US$300.00-800.00
1 Piece(MOQ)
Corrosion Resistant Air Compressor Heat Recovery System for Tropical Industrial Areas
US$800.00-20,000.00
1 Piece(MOQ)
Factory Price Customize Electric Vehicle Battery with Liquid Cooling System
US$300.00-800.00
1 Piece(MOQ)
Water Cooling Coil System with Aidear's High-Efficiency Tube Design
US$199.00
1 Piece(MOQ)
Custom Air Compressor Heat Recovery System for Various Workshop Applications
US$1,000.00-20,000.00
1 Piece(MOQ)
Air Compressor Heat Recovery System for Industrial Energy Saving
US$1,000.00-20,000.00
1 Piece(MOQ)
Advanced Heat Transfer Finned Tube System for Boiler Upgrades
US$64.00-75.00
1 pieces(MOQ)
Energy Saving Solution Industrial Air Compressor Heat Recovery System
US$1,000.00-20,000.00
1 Piece(MOQ)
OEM High Voltage Electric Car Battery with Liquid Cooling System
US$300.00-800.00
1 Piece(MOQ)
Industrial Mee System for Food Processing Juice Concentration with 95% Efficiency
US$1,540.00-6,490,000.00
1 Piece(MOQ)
Advanced Industrial Heat Exchanger System for Efficient Factory Ventilation
US$63.00-129.00
1 sets(MOQ)
Advanced Industrial Tubular Cooling Systems for Maximum Efficiency
US$130.00-420.00
1 units(MOQ)
Popular Choice Environmental Friendly Industrial Decarbonization System for Power Stations
US$1,400,000.00-5,000,000.00
1 Piece(MOQ)
High-Performance Graphite Tube Reactor Cooling System for Chemicals
US$18.20-39.90
1 Piece(MOQ)
Premium Custom Wooden Cooling Case System for 1-Year Performance
US$128.00-1,780.00
1 Piece(MOQ)



















