Powered by Made-in-China.com
13 Step Stair HD Steel Work Support Platform Frame for Chemical Machinery
US$70.00-300.00
100 Pieces
Sample price:US$50.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online After ServiceWarranty
1 YearModel NO.
HSHT00013Material
Alloy 6061-T6Type
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Special-Shaped ScaffoldingErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldTransport Package
Standard Seaworth PackagingSpecification
alloyTrademark
OEMOrigin
ChinaProduction Capacity
1000PCS/MonthKey features
Custom Logo & Branding: Permanent logo or sticker customization available per customer requirements.
Professional Engineering Support: Expert engineers provide engineered drawings and challenging scaffolding access solutions.
High-Quality Alloy Material: Constructed from durable Alloy 6061-T6 for reliable performance in chemical machinery.
Comprehensive Quality Control: All products undergo full testing and traceability systems before dispatch.
Flexible Customization Options: Supports customization from samples, designs, and full or minor modifications.
ISO 9001 Certified Manufacturer: Established in 2009 with ISO9001:2015 management system certification.
Global Export Experience: 15 years of export experience serving North America and European markets.
Reliable After-Sales Service: Online support with replacement parts or compensation for product issues.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 15 Years CertifiedNearest Port: Yangzhou PortAverage Response Time: ≤24h
About Our Factory & Business Background
AddressNo 109 Nashan Industrial Park, Xieji, Yizheng, Yangzhou, Jiangsu, China
Plant Area12271 square meters
Number of Employees64
Registered Capital22,690,000 RMB
Terms of PaymentLC, T/T, D/P, Western Union, PayPal, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 PC
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsScaffolding
Production Lines1
Production MachinesLaser Cutting Machine, Pipe Cutting Machine, Shearing Machine, Bending Machine, Sawing Machine, Pipe Cutting Machine, Puncher, Press, Pipe Puncher, Robot Welding Machine, Mechanical Performance Testing Machine
QA/QC inspectors3 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2009-01-21
Main MarketsNorth America, Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period?
A:
We provide a 1-year warranty for our products.
Q:What is the MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:What are the payment terms?
A:
We accept T/T and L/C, others are negotiable.
Q:Can we customize our company logo?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
HS company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Yizheng Hengsheng Machinery Co., Ltd.
Yizheng Hengsheng Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Mobile Steel Scaffolding Frame for Safe Work Platforms
US$25.90-32.90
100 Pieces(MOQ)
Steel Wood Plank Support Frame for Temporary Work Platforms and Scaffolding Equipment
US$19.90-26.50
10 Pieces(MOQ)
Galvanized Steel Wood Plank Support Frame for Heavy Duty Scaffolding Platforms
US$19.90-26.50
10 Pieces(MOQ)
Galvanized Mobile Steel Scaffolding Frame Walk Through Scaffold Metal Platform for Construction
US$5.00-20.50
100 Pieces(MOQ)
Anti Rust Steel Frame for WPC Decking Wood Plank Support Frame
US$19.90-26.50
10 Pieces(MOQ)
Wood Plank Support Frame Galvanized Steel Support Bracket for Construction
US$19.90-26.50
10 Pieces(MOQ)
Easy Erect Heavy Duty Galvanized Steel Walk Through Scaffold Frame for Construction
US$8.35-10.00
100 Pieces(MOQ)
JIS Style Galvanized Steel C Tyle Beam Clamp Frame for Building Work
US$1.10-1.16
5,000 Pieces(MOQ)
High Strength Mason Frame Scaffolding for Work Platform Support
US$1.00-15.00
500 Pieces(MOQ)
Modular Design Hot-DIP Galvanized 1605mm Guardrail Frame for Stair Tower Scaffolding System
US$1,100.00-1,350.00
20 Tons(MOQ)
Safe Working Platform Hot-DIP Galvanized 1605mm Guardrail Frame for Construction Site
US$1,100.00-1,350.00
20 Tons(MOQ)
Heavy-Duty Scaffolding Frames for Secure Elevated Work Platforms
US$5.00-30.00
20 Tons(MOQ)
Customizable Steel Scaffold Frame with Durable Surface Finish for Plastering and Exterior Work Use
US$36.00-55.00
1,000 Pieces(MOQ)
Rust Proof Hot-DIP Galvanized 1605mm Guardrail Frame for Stair Tower Scaffolding System
US$1,100.00-1,350.00
20 Tons(MOQ)
High Strength Steel Hot-DIP Galvanized 3000mm Guardrail Frame for Building Construction
US$1,100.00-1,350.00
20 Tons(MOQ)



















