Powered by Made-in-China.com
BS1139 Beam Clamp Round Scaffold Coupler 48mm Scaffolding Forged Girder Coupler
US$0.50-1.50
1 Piece
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
YearsMaterial
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldRaw Material
MetalGrand
Q235Surface Treatment
Electro Galvaznied/Hot DIP GalvanizedUsage
48.3/48.6mm PipeProduction Procedure
PressedMarket
OverseasFunction
ExportTransport Package
PalletSpecification
48.6mm/60.5mmTrademark
HUAYOUOrigin
ChinaHS Code
7308400000Production Capacity
5000000pieces/YearKey features
Customizable Raw Material: Available in Q235 or Q355 steel to meet specific project requirements.
Customizable Surface Treatment: Options include Electro Galvanized or Hot DIP Galvanized for enhanced corrosion resistance.
Wide Pipe Size Compatibility: Designed for 42mm, 48.3mm, 48.6mm, 60.5mm, and 76mm scaffolding pipes.
Multiple Clamp Types: Offers Fixed, Swivel, and Beam Clamp varieties including JIS and Korean standards.
ISO 9001 & SGS Certified: Products meet international quality standards with ISO 9001 and SGS certification.
Flexible Packaging Options: Available on wooden pallets, steel pallets, or carton boxes with custom logo design.
Free Sample Availability: Samples provided free of charge, with shipping costs covered by the buyer.
Fast Production Capacity: Large workshop with 100+ staff capable of loading 10 containers in one day.
Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.56hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
About Our Factory & Business Background
AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.
Send Inquiry
*To:
Tianjin Huayou Scaffolding Co., Ltd.
Tianjin Huayou Scaffolding Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High Quality Galvanized Pressed Drop Forged Scaffolding Clamp Double Swivel Coupler Clamp
US$0.59-0.79
500 Pieces(MOQ)
Scaffolding Coupler Brazil Type Pressed Forged Swivel /Double Coupler En74 BS1139 Standard Coupler
US$1.75-1.85
1,000 Pieces(MOQ)
M 48.3mm British Standard Drop Forged Scaffolding Beam Coupler Clamp for Sale
US$0.50-1.20
100 Pieces(MOQ)
En74/BS1139 Standard Forged Scaffold Double/Swivel Coupler/Clamp/Fitting in German Style
US$1.52-1.58
2,000 Pieces(MOQ)
BS Double Coupler Galvanized En74 Drop Forged 48.3*48.3mm Scaffolding Clamp Swivel Coupler
US$0.80-2.50
500 Pieces(MOQ)
Drop Forged Scaffolding Grinder Coupler Swivel Scaffolding Girder Cample
US$1.58-1.90
5,000 Pieces(MOQ)
BS1139 En74 Drop Forged Fixed Double Swivel Andaimes Scaffolding Clamp Scaffolding Coupler for Sale
US$4.65-5.25
1,000 Pieces(MOQ)
China Scaffolding Q235 Steel Galvanized Forged Right Angle Swivel Scaffolding Clamp Coupler
US$0.85-1.50
5,000 Pieces(MOQ)
DOP Forged a Half Coupler Scaffolding Tube Clamp Single Coupler
US$2.82-2.85
1,000 Pieces(MOQ)
BS1139 Galvanized Scaffolding Rotating Clamp En74 Scaffolding Pipe Clamp Couplers
US$1.49-1.52
10 Pieces(MOQ)
Steel Right Angle Coupler Scaffolding Pipe Clamp Scaffolding Parts From Manufacturer
US$2.13-2.43
100 Pieces(MOQ)
Wholesale Custom Scaffolding Fixed Drop Forged Double Coupler Scaffold Fixed Clamp
US$4.44-4.97
100 Pieces(MOQ)
Scaffolding Clamp Drop Forged Double Coupler for Sale
US$1.17-1.47
500 Pieces(MOQ)



















