SourcingAI
Try for free
Powered by Made-in-China.com
BS1139 Galvanized Scaffolding Pipe Connector Pin Pressed Joint Pin for Construction
US$0.65-5.00
1 Piece
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Years

Model NO.

JP-2

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Raw Material

Metal

Grand

Q235

Surface Treatment

Electro Galvanized / Hot DIP Galvanized

Usage

48.3/48.6mm Pipe

Production Procedure

Pressed & Forged

Rod Grade

8.8

Transport Package

Pallet

Specification

48.3mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

BS1139 Standard Compliance: Fittings strictly adhere to BS1139 and EN74 standards for global compatibility.
Dual Surface Treatment: Available in Electro-Galvanized and Hot DIP Galvanized for superior corrosion resistance.
High-Strength Material: Constructed from Q235 steel with 8.8 grade rods ensuring structural integrity.
Comprehensive Product Range: Includes double, swivel, half, beam, and sleeve couplers for all scaffolding needs.
Flexible Packaging Options: Offered in bulk, wooden pallets, or steel pallets to suit logistics requirements.
Custom Mould Capability: Mature moulds available for custom designs and production upon request.
Established Manufacturing Base: 5000 sqm workshop with over 100 staff ensuring high-volume production capacity.
Global Export Experience: Products exported to Europe, America, Middle East, and Southeast Asia markets.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.00hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Galvanized Zinc Pressed Joint Pin for Korean Market
Made-in-China.com