SourcingAI
Try for free
Powered by Made-in-China.com
Building Material Construction Scaffolding Galvanized Steel Pipe Swivel Coupler with SGS
US$0.95-2.50
1 Piece
Sample price:US$0.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Years

Model NO.

SC-1

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Raw Material

Metal

Materials Grade

Q235,Q355

Surface Treatment

Electro Galvaznied/Hot DIP Galvanized

Usage

for 48.3/48.6mm Pipe

Production Procedure

Pressed, Drop Forged

Market

Overseas

Standard

BS/JIS/En Standard

Transport Package

Pallet

Specification

48.6mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

SGS Certified Quality: Products certified with SGS and ISO 9001 standards for reliable performance.
Customizable Materials: Available in Q235/Q355 steel with electro-galvanized or hot-dip galvanized finishes.
Multiple Standard Options: Complies with BS, JIS, and EN standards for various scaffolding coupler types.
Free Sample Availability: Free samples provided for quality verification, with buyer covering shipping costs.
Efficient Production Capacity: 5000 sqm workshop with 100+ staff, capable of loading 10 containers per day.
Flexible Payment Terms: Accepts T/T or 100% irrevocable LC at sight, with negotiation options available.
Fast Delivery Cycle: Production cycle typically takes 20-30 days after order confirmation.
Secure Packaging Solutions: Packed in wooden/steel pallets or cartons to ensure high protection during shipment.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.12hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Shlomi Construction Material Scaffolding Swivel Coupler
Made-in-China.com