SourcingAI
Try for free
Powered by Made-in-China.com
Building Material Galvanized Scaffolding System Accessories Pressed Scaffold Coupler Made in China
US$0.50-1.50
1 Piece
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Years

Model NO.

HY-SD-19

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Raw Material

Metal

Grand

Q235

Surface Treatment

Electro Galvaznied/Hot DIP Galvanized

Usage

48.3/48.6mm Pipe

Production Procedure

Pressed

Market

Overseas

Function

Export

Transport Package

Pallet

Specification

48.6mm/60.5mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

Customizable Raw Material: Available in Q235 or Q355 steel to meet specific project requirements.
Customizable Surface Treatment: Options include Electro Galvanized or Hot DIP Galvanized for enhanced corrosion resistance.
Wide Range of Coupler Types: Offers Fixed, Swivel, Bone Joint, and Beam clamps in JIS and Korean standards.
High Production Capacity: 5000 sqm workshop with over 100 staff capable of loading 10 containers daily.
Mature Mould System: Complete mould library for all scaffolding coupler types to meet diverse standards.
Strategic Location: Located in Tianjin, a major port city near raw materials for efficient logistics.
Professional Quality Control: Managed by technicians and workers with over 10 years of industry experience.
Flexible Packaging Options: Wooden/steel pallets, cartons, or woven bags with optional logo design services.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.12hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQs, which can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS, etc.
Q:Can I get some samples?
A:
Yes, the Sample is free, but the shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like