Powered by Made-in-China.com
Constuction Galvanized Size 300mm/320mm Perforated Plank Steel Decking Scaffolding Board Steel Plank with Hooks
US$3.00-18.00
1 Piece
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Remote or on-Site Technical SupportWarranty
6 MonthsModel NO.
TJHY-SP1101Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldSruface Treatment
Pre-Galvanized/Hot DIP Galv./PaintedSteel Grade
Q195 / Q235/Q355Color
SilverCertificate
SGS/ISOWidth
0.5-4mThickness
0.8-2.0mmHeight
38mm/40mm/45mm/50mm/63mm/76mmSupport
Flat / Square /Ladder TypeEnd Cap
Cover / InsertApplication
Building/Tunnel/Bridge ConstructionDelivery Time
15-20daysMOQ
1 PieceOEM
AvailableTransport Package
by Pallet, Suitable for Sea TransportSpecification
210mm/240mm/250mm/225mm/230mm/300mm/320mmTrademark
HUAYOUOrigin
ChinaHS Code
7308400000Production Capacity
40 Containers / MonthKey features
Customizable Specifications: Width, thickness, height, and steel grade can be customized to meet specific project needs.
Versatile Surface Treatment: Available in Pre-Galvanized, Hot DIP Galvanized, or Painted finishes for durability.
Global Certification: Products comply with BS EN 12811-1, AS 1577, and hold ISO 9001 and SGS certifications.
Flexible Packaging Options: Supports bundle, loose, or steel pallet packaging to optimize freight costs and convenience.
Wide Application Range: Suitable for building, tunnel, and bridge construction, compatible with Ring Lock and Cup Lock systems.
Low MOQ Support: Minimum Order Quantity starts from just 1 piece, allowing for flexible trial orders.
Comprehensive After-Sales: Provides remote or on-site technical support and a 6-month warranty for peace of mind.
Fast Production Cycle: Standard production time is around 20-30 days, with off-season lead times within 15 workdays.
Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤4.90hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
About Our Factory & Business Background
AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.
Send Inquiry
*To:
Tianjin Huayou Scaffolding Co., Ltd.
Tianjin Huayou Scaffolding Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
AS/NZS 1576 Perforated Ringlock Scaffold Galvanized Steel Plank Board
US$25.00-40.00
100 Pieces(MOQ)
Tianjin Galvanized Scaffolding Steel Decking Walk Board Plank for Sale
US$1,050.00-1,100.00
20 Tons(MOQ)
Scaffold Steel Planks Without Hooks Perforated Steel Catwalk Metal Deck Scaffold Board
US$1,000.00-1,200.00
30 Tons(MOQ)
High Quality Ringlock Scaffolding Platform Galvanized Perforated Steel Plank with Hook
US$1,000.00-1,200.00
30 Tons(MOQ)
Easy Hook Hot DIP Galvanized Q235 320mm Scaffolding Steel Plank for Construction
US$5.88-13.00
200 Pieces(MOQ)
Perforated Scaffold Steel Plank, Pre-Galvanized Steel Plank, Scaffolding Metal Deck
US$1,050.00-1,100.00
20 Tons(MOQ)
Staging Planks Hot DIP Galvanized 320mm Wide for Building Construction
US$4.50-8.50
100 Pieces(MOQ)
Heavy Duty Perforated Galvanized Stainless Steel Scaffold Plank for Cuplock Scaffolding System
US$45.00-48.00
30 Sets(MOQ)
Heavy-Duty Galvanized Hook Perforated Scaffolding Steel Walk Plank
US$34.00-35.00
100 Pieces(MOQ)
Galvanized Layher Scaffold Deck / Planks for Steel Ringlock Scaffolding
US$2.00-30.00
100 Pieces(MOQ)
Durable Perforated Steel Plank for Safe Construction Sites
US$6.00-7.90
500 Pieces(MOQ)



















