SourcingAI
Try for free
Powered by Made-in-China.com
HDG BS1139 Round Disc Lock Scaffolding System Ringlock Vertical Scaffold for Construction
US$900.00-1,500.00
1 Ton
Sample price:US$1.50/kg.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Frames

Construction Properties

Building Scaffold

Sruface Treatment

Galvanized/Hot DIP Galvanized/Painted

Steel Grade

Q355 / Q235

Certificate

SGS/ISO

MOQ

1PCS

OEM

Available/Customized

Application

Building/Tunnel/Bridge Construction

Advantage

Heavy Loads, Stable, Flexible, Easy Assembling

Transport Package

by Bundle or by Pallet, Suitable for Sea Transport

Specification

48.3mm or 60.3mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

50000tons /Year

Key features

Heavy Load Capacity: Designed for heavy loads, ensuring stability and safety in construction projects.
Flexible Assembly: Modular design allows for easy and flexible assembling on various sites.
Customizable Surface: Surface treatment options include Hot Dip Galvanized, Electro-Galvanized, Powder Coated, or Painted.
Premium Steel Material: Constructed from high-quality Q235 or Q355 steel for durability.
Wide Application: Suitable for building, tunnel, and bridge construction as external or internal support.
Certified Quality: Products certified with ISO 9001 and SGS standards.
Custom OEM Service: OEM and customized solutions available for steel grade, surface, and certificates.
Stable Structure: Multi-pole and combined scaffolding structure ensures high stability.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤4.94hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What is the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like