SourcingAI
Try for free
Powered by Made-in-China.com
High-Quality Scaffolding Drop Forged /Pressed British BS1139scaffold Coupler and Fitting
US$1.00
10 Pieces

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

TJHY-190

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Surface Treatment

Electro Galvaznied/Hot DIP Galvanized

Raw Material

Metal

Transport Package

Pallet

Specification

48.3mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

Customizable Raw Material: Raw material can be customized to Q235 or Q355 steel based on requirements.
Surface Treatment Options: Surface treatment is customizable, offering Electro Galvanized or Hot Dip Galvanized finishes.
Wide Product Range: Includes Double, Swivel, Putlog, Sleeve, and Beam couplers meeting BS1139/EN74 standards.
High Production Efficiency: Capable of loading 10 containers per day with strict production procedures and 6S management.
Professional Quality Control: Over 10 years of experienced workers and professional technicians ensure high quality guarantee.
Flexible Packaging: Packed with wooden/steel pallets or cartons; logo design services available for protection.
Certified Standards: Products comply with BS1139/EN74 standards and hold ISO 9001 and SGS certifications.
Strategic Location: Located in Tianjin, a major port city, ensuring easy transport and low logistics costs.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤4.94hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Port/Tianjin XinGang Port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Factory Supply En 74 Drop Forged Scaffolding Fittings
Made-in-China.com
British Type Forged Pressed Scaffolding Pipe Fitting
Made-in-China.com
Good Strength BS1139 Pressed Putlog Coupler Fitting
Made-in-China.com