SourcingAI
Try for free
Powered by Made-in-China.com
Hot DIP Galvanized Forge Press Accessories Construction Scaffold Factory Clamp Fix Coupler
US$0.65-5.00
1 Piece
Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Material

Steel

Type

Fixed

Model NO.

SC-6

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Raw Material

Metal

Grand

Q235

Surface Treatment

Electro Galvanized / Hot DIP Galvanized

Usage

48.3/48.6mm Pipe

Production Procedure

Pressed & Forged

Rod Grade

8.8

Transport Package

Pallet

Specification

48.3mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

Dual Surface Treatment: Available in Electro-Galvanized and Hot DIP Galvanized for superior corrosion resistance.
Forged & Pressed Manufacturing: Produced via pressing and forging processes to ensure high strength and durability.
Wide Standard Compliance: Meets BS1139, EN74, JIS, and Korean standards for global compatibility.
Diverse Coupler Types: Includes double, swivel, half, putlog, beam, and sleeve couplers for various scaffolding needs.
Q235 Steel Material: Constructed from high-quality Q235 steel with 8.8 grade rod strength.
Custom Mold Design: Mature molds available for all coupler types with custom design and production capabilities.
Flexible Packaging Options: Offers bulk, wooden pallet, or steel pallet packaging suitable for sea transportation.
ISO 9001 Certified: Factory holds ISO 9001 and SGS certifications ensuring quality management standards.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.56hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like