Powered by Made-in-China.com
Hot DIP Galvanizers Q235 Steel Frame Moving Galvanized Layher Tower Ringlock Scaffold System
US$900.00-1,500.00
1 Ton
Sample price:US$1.00/kg.Request sample
Product profile
Customization
AvailableAfter-sales Service
Remote or on-Site Technical SupportWarranty
3yearsModel NO.
TJHY-RL-235Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldSruface Treatment
Galvanized/Hot DIP Galvanized/PaintedSteel Grade
Q355 / Q235Certificate
SGS/ISOMOQ
1PCSOEM
Available/CustomizedApplication
Building/Tunnel/Bridge ConstructionAdvantage
Heavy Loads, Stable, Flexible, Easy AssemblingTransport Package
by Bundle or by Pallet, Suitable for Sea TransportSpecification
48.3mm or 60.3mmTrademark
HUAYOUOrigin
ChinaHS Code
7308400000Production Capacity
50000tons /YearKey features
Heavy Load Capacity: Designed for heavy loads ensuring stability and safety in construction projects.
Easy Assembly: Modular design allows for quick and flexible erection on various sites.
Customizable Surface: Available in Hot Dip Galvanized, Electro-Galvanized, Powder Coated, or Painted finishes.
Flexible Material Options: Constructed with Q235 or Q355 steel grades to meet different strength requirements.
Comprehensive Warranty: Includes a 3-year warranty covering mechanical defects for peace of mind.
Global Technical Support: Remote or on-site technical support available to assist with installation and maintenance.
Low MOQ Requirement: Minimum Order Quantity starts at 1 piece, suitable for small projects.
Versatile Applications: Ideal for building, tunnel, and bridge construction projects worldwide.
Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.08hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
About Our Factory & Business Background
AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.
Send Inquiry
*To:
Tianjin Huayou Scaffolding Co., Ltd.
Tianjin Huayou Scaffolding Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Andamios En Venta Hot DIP Galvanized Full Set Steel Ringlock Scaffolding System
US$4.50-8.50
100 Pieces(MOQ)
Q235 Q355 Hot-DIP Galvanized Cuplock Steel Cuplock System for Sale
US$5.00-8.00
1 kg(MOQ)
Affordable Hot DIP Galvanized Ringlock System for Building Projects
US$23.90-29.90
100 Pieces(MOQ)
Hot DIP Galvanized Steel Ringlock Scaffolding System with Rosette and Clamp for Building Material
US$76.00-215.00
100 Pieces(MOQ)
Construction Ringlock Hot DIP Galvanized Steel Building Material Frame Scaffold System
US$28.00-92.00
1 Piece(MOQ)
Heavy-Duty Scaffolding Hot DIP Galvanized Steel Ringlock Scaffold System
US$23.90-29.90
100 Pieces(MOQ)
Wholesale Hot DIP Galvanized Scaffold Tower Ringlock System for Construction
US$12.50-85.50
100 Pieces(MOQ)
Hot-DIP Galvanized Steel Scaffold Multi Prop Shoring System for Formwork Construction
US$20.00-150.00
20 Sets(MOQ)
Hot DIP Galvanized Steel Ringlock Safway Scaffolding System
US$78.00-136.00
100 Pieces(MOQ)
Layher Ringlock Scaffolding System for Steel Construction Building Material Ringlock System for Formwork
US$900.00-1,500.00
1 Ton(MOQ)
BS1139 48.3*3.25 Hot DIP Galvanized Steel Ringlock Scaffolding System with Walking Plank and Adjustable Jack
US$163.00-200.00
1 Piece(MOQ)
Hot-DIP Galvanized Steel Multi Prop Scaffolding System for Lightweight Formwork Construction
US$20.00-150.00
20 Sets(MOQ)
Heavy-Duty Q235 Hot-DIP Galvanized Steel Ringlock Scaffolding System Layher
US$675.00-685.00
25 Tons(MOQ)
Construction Hot DIP Galvanized Steel Cuplock Scaffold Cuplock System
US$1.00-20.00
1 kg(MOQ)
Aluminum Formwork Steel Galvanized Layher Scaffolding System for Sale
US$4.50-8.50
1,000 Pieces(MOQ)
Frame Scaffold Hot DIP Galvanized Steel Tube Adjustable Scaffold System for Bridge Support
US$30.00-50.00
300 Pieces(MOQ)



















