Powered by Made-in-China.com
SGS Tested BS1139 Pressed Bone Joint Scaffold Clamp for Tubular System
US$0.50-1.50
1 Piece
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
YearsModel NO.
HY-SC-09Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldRaw Material
MetalGrand
Q235Surface Treatment
Electro Galvaznied/Hot DIP GalvanizedUsage
48.3/48.6mm PipeProduction Procedure
PressedMarket
OverseasFunction
ExportTransport Package
PalletSpecification
48.6mm/60.5mmTrademark
HUAYOUOrigin
ChinaHS Code
7308400000Production Capacity
5000000pieces/YearKey features
SGS Tested Certification: Product verified by SGS and meets BS1139 standards for safety and quality.
Diverse Coupler Types: Offers drop forged and pressed couplers including fixed, swivel, and putlog types.
Customizable Packaging: Wooden/steel pallets or carton boxes available with option to design your logo.
High Production Capacity: 5000 sqm workshop with 100+ staff capable of loading 10 containers daily.
Mature Mould Technology: Complete moulds for JIS, Korean, and BS standards to meet specific demands.
Strategic Location: Located in Tianjin, a major port city for efficient global cargo transport.
Quality Control System: Strict 6S management and 10+ years of experienced technical staff.
Free Sample Availability: Samples provided free of charge, customer only pays shipping cost.
Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤4.82hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA
About Our Factory & Business Background
AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQs, which can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS, etc.
Q:Can I get some samples?
A:
Yes, the Sample is free, but the shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.
Send Inquiry
*To:
Tianjin Huayou Scaffolding Co., Ltd.
Tianjin Huayou Scaffolding Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffold Pipe Fitting Accessories Drop Forged Pressed Scaffolding Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
Scaffold Steel Rosette Clamp for System Scaffolding Vertical Standard or Tube
US$2.62-2.97
100 Pieces(MOQ)
Galvanized Steel Pipe Fitting Sleeve Coupler Scaffolding Clamp for Scaffolding Tubular System
US$0.50-1.00
1,000 Pieces(MOQ)
Metal Steel Forged Forged Cast Iron Clamp for Scaffold System
US$1.50
1,000 Pieces(MOQ)
Factory Direct SGS BS1139 Pressed Drop Forged Scaffold Clamp Scaffolding Clamp
US$1.50-2.00
1,000 Pieces(MOQ)
Steel Pressed Ladder Clamp Square Edge (Double Sided) for System Scaffolding
US$1.26-1.45
100 Pieces(MOQ)
En74 48.3mm Pressed Type Pipe Joint Coupler Beam Scaffolding Clamp
US$1.75-1.96
100 Pieces(MOQ)
Scaffolding Clamp En74/BS1139 Scaffolding System for Oil & Gas Maintenance Projects Construction.
US$0.88-0.923
500 Pieces(MOQ)
BS1139 Scaffolding Tubes Fittings Materials Parts Cross Swivel Clamp for Scaffolding Tubular
US$1.20-2.10
1,000 Pieces(MOQ)
German Type Forged Spigot Adapter Clamp with Half Coupler for System Scaffolding
US$2.73-3.03
100 Pieces(MOQ)
Durable Scaffold Tube Pressed Swivel Coupler Scaffolding Clamp for Industrial Applications
US$0.90
5,000 Pieces(MOQ)
Steel Quick Stage Scaffolding Components Cross Brace and Double Coupler Clamp for Ringlock Scaffold System
US$105.00-204.00
1 Piece(MOQ)
AS/NZS Test Standard Pressed Hook Putlog Coupler/Clamp for Australia Tubular Scaffolding System
US$0.70-2.00
500 Pieces(MOQ)



















