SourcingAI
Try for free
Powered by Made-in-China.com
Steel Pipe Fitting Connector Scaffolding Clamp Adapter Hardware Coupling Fastener Coupler
US$0.40-3.00
1 Piece
Sample price:US$0.95/piece.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Years

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Couplers

Construction Properties

Building Scaffold

Raw Material

Metal

Grand

Q235/Q355

Surface Treatment

Electro Galvaznied/Hot DIP Galvanized

Usage

48.3/48.6mm Pipe

Production Procedure

Pressed

Market

Overseas

Function

Export

Transport Package

Pallet

Specification

48.6mm/48.3mm

Trademark

HUAYOU

Origin

China

HS Code

7308400000

Production Capacity

5000000pieces/Year

Key features

Comprehensive Customization: Raw material, surface treatment, and specifications are fully customizable to meet specific project needs.
Multiple Standard Compliance: Products comply with BS1139, EN74, JIS A8951, and other international standards for global use.
Durable Surface Treatment: Available in Electro Galvanized, Hot DIP Galvanized, and Powder Coated options for enhanced corrosion resistance.
High Production Capacity: 5000 sqm workshop with over 100 staff capable of loading 10 containers in one day.
Free Sample Availability: Samples are provided free of charge, with the buyer responsible only for shipping costs.
Flexible Payment Terms: Accepts T/T, 100% irrevocable LC at sight, and other negotiable payment methods.
Fast Production Cycle: Standard production cycle is 20-30 days, with off-peak lead times within 15 workdays.
Professional Quality Control: Managed by technicians and workers with over 10 years of experience ensuring high quality.

Company profile

Business Type: Other, Group CorporationExport Year: 2019-03-19Nearest Port: Tianjin PortAverage Response Time: ≤3.10hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, FCA

About Our Factory & Business Background

AddressRm331-332, Huaying Building, Airport Economic Zone, Tianjin City, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Scaffold, Scaffolding System, Ringlock Scaffolding, Building Material, Formwork, Machine, Hardware, Metal Work, Construction

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Where is the loading port?
A:
Tianjin Xin port
Q:What's the MOQ of the product?
A:
Different item has different MOQ, can be negotiated.
Q:What certificates do you have?
A:
We have ISO 9001, SGS etc.
Q:Can I get some samples?
A:
Yes, Sample is free, but shipping cost is on your side.
Q:How long is the production cycle after ordering?
A:
Generally need around 20-30 days.

Send Inquiry

*To:Tianjin Huayou Scaffolding Co., Ltd.Tianjin Huayou Scaffolding Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like