SourcingAI
Try for free
Powered by Made-in-China.com
3-Phase Efficient Prefabricated Solar Substation - 22kv/35kv Step-up Transformer, IEC Standard for PV Plants
US$59,500.00
10 Pieces

Product profile

Customization

Available

Application

Power, Electronic, Instrument

Phase

Three

Model NO.

YB-4000-22

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001

Usage

Single-phase Transformer, Power Transformer, Distribution Transformer

Frequency Characteristics

Power Frequency

Shape of Core

Three-Limb Core-Type Core

Brand

Hubang

Winding Material

Copper/Aluminum

Capacity

4000kVA

High Voltage

34.5kv

Low Voltage

690y-398

Standard

IEEE/CSA/IEC

Transport Package

Stretch Film Wrapped/Containerized

Specification

35cbm

Trademark

HUBANG

Origin

China

HS Code

8504220000

Production Capacity

2000 PCS Per Year

Key features

Engineered for PV Plants:Designed specifically to handle the fluctuations and unique load profiles of utility-scale solar power plants, ensuring seamless grid integration.
Prefabricated & Modular Design:Factory-assembled, wired, and fully tested before shipping. Significantly reduces on-site installation time, labor costs, and commissioning complexity.
Full IEC Standards Compliance:Manufactured and certified in strict accordance with IEC standards, ensuring global compatibility, top-tier safety, and smooth local grid approvals.

Company profile

Jiangsu Beichen Hubang Electric Power Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceExhibition Experience
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 18 YearsNearest Port: shanghai port, ningbo port, qingdao portAverage Response Time: ≤8.25h

About Our Factory & Business Background

AddressNo. 20, Nanhai Avenue, Haian City, Nantong, Jiangsu, China
Plant Area28496 square meters
Number of Employees264
Registered Capital117,768,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA, FAS, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsTransformer, Iron Core, Dry-Type Transformers, Oil-Immersed Transformers, Prefabricated Electrical Substation, Core, Silicon Steel Sheet, Pad-Mounted Transformer
Production Lines3
Production MachinesAssembly Line, Drying Equipment, Winding Machine, Copper Foil Production Line, Lab
QA/QC inspectors10 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers17 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2007-09-12
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No

Product Q&A

Q:What is the efficiency rating of the 22 KV /35 KV step-up transformer?
A:
Our transformers are engineered with high-grade silicon steel cores and optimized copper/aluminum windings, achieving a peak efficiency of up to 99%. They feature ultra-low no-load and load losses, complying strictly with the latest IEC eco-design standards to maximize your PV plant's ROI.
Q:What does "Prefabricated" mean for our project timeline?
A:
It means the transformer, MV switchgear, LV panels, and auxiliary systems are $100\%$ pre-assembled, wired, and factory-tested before shipment. Once it arrives at your site, it only requires foundation placement, external cable connections, and final commissioning. This reduces on-site civil work and installation time by up to 70%.
Q:What factory tests are performed before shipment?
A:
Every single unit undergoes rigorous factory acceptance testing (FAT) before dispatch, including routine tests for transformer insulation, voltage ratio, winding resistance, dielectric tests, and functional simulation of all switchgears and protection loops. A comprehensive test report is provided with the delivery.

Send Inquiry

*To:Jiangsu Beichen Hubang Electric Power Co., Ltd.Jiangsu Beichen Hubang Electric Power Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like