Powered by Made-in-China.com
Advanced Power Management and Automatic Remote Monitoring Control System
US$5,000.00
1 Set
Product profile
Customization
AvailableCondition
NewCustomized
CustomizedModel NO.
PODelivery Time
30-90 DayPort of Shipment
Tianjin or ShanghaiOEM Service
YesModes of Packaging
Standard Export PackingShipment Mark
According to Your Client's RequestProduct Name
Power Management and Control SoftwareSpecification
CustomizableOrigin
ChinaKey features
Customized Solutions: Product is fully customized with shipment marks according to client requests.
OEM and ODM Services: Both OEM and ODM services are available for tailored manufacturing needs.
Dual-Engine Strategy: Focuses on energy digitalization and conservation for innovative solutions.
Comprehensive Application: Serves industrial parks, data centers, healthcare, and grid clients globally.
Full Lifecycle Support: Provides technical consulting, software development, and turnkey integration.
National High-Tech Enterprise: State-supported innovative enterprise established in 2016 with 20M RMB capital.
100% Product Inspection: All finished products undergo visual and functional inspection before shipment.
Flexible Lead Time: Average lead time is one month for both peak and off-peak seasons.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2025-09-01Nearest Port: TianjinAverage Response Time: ≤0.90hTerms of Payment: LC, T/T
AI-Powered supplier vetting
SummaryThe supplier is identified as a trading company focused on energy digitalization, power systems, metering, carbon analysis, and energy-saving services. It reports documented procedures for corrective actions, customer complaints, and finished-product inspection, plus inventory and service coverage in Iraq. Its customization, ODM, OEM, and recent product-development capabilities are supported by the provided information. However, no management-system certification, overseas warehouse, overseas branch or agent, offline trade-show participation, SDK, or 3D software design capability is reported. Export experience is stated as one year, and manufacturing capacity is not supported by a valid contract with related subcontractors. Financial credibility cannot be assessed because the provided financial figures are excluded from this analysis and the remaining information is insufficient.
CertificationsThe supplier’s certification of management systems is recorded as NIL. This is explicit evidence that no management-system certification is reported in the provided information.
After-Sales capabilityThe supplier has documented and followed procedures for corrective/preventive actions and customer complaints, and it reports installation, training, repair, maintenance, and debugging services in Iraq. It also has inventory capability, but lacks overseas warehouses, overseas showrooms, overseas agents or branches, and offline trade-show participation, limiting the breadth of its overseas service infrastructure.
R&D capabilityThe supplier reports new products during the past year and provides ODM and OEM services, while its business description emphasizes innovation in energy digitalization and energy conservation. However, it is not identified as a professional technical supplier and has no available SDK or 3D software design service, so innovation capability is supported in some areas but not comprehensively established.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, flexible customization, and ODM services. These repeated service descriptions provide clear evidence of broad customization capability.
Product Q&A
Q:Is the product customized?
A:
Yes, the product is customized, including shipment marks according to client requests.
Q:Do you offer OEM and ODM services?
A:
Yes, both OEM and ODM services are available for this product.
Q:What is the delivery time?
A:
The delivery time is 30 to 90 days.
Q:What is the lead time for orders?
A:
The average lead time is one month for both peak and off-peak seasons.
Q:Where is the shipment port?
A:
The nearest port is Tianjin, and shipments can also be made from Shanghai.
Send Inquiry
*To:
Beijing Hezhong Huineng Electric Technology Co., Ltd
Beijing Hezhong Huineng Electric Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Real-Time Pump Management System for Efficient Power Monitoring
US$50.00-53.00
1 Piece(MOQ)
Prepaid Vending Management System with Advanced Control Watt-Hour Meter
US$100.00-500.00
1 Piece(MOQ)
Advanced Smart Programmable Logic Control System for Remote Monitoring
US$5,000.00
1 Set(MOQ)
Professional Electric Power Management Remote Central Control System
US$5,000.00
1 Set(MOQ)
Digital Electricity Energy Monitoring System for Power Management System
Negotiable
1 Piece(MOQ)
Power Monitoring and Control System of Coal Mine
US$3,000.00-10,000.00
2 Sets(MOQ)
Advanced Touchscreen Control System for Enhanced Pump Management
US$98.00-139.00
1 Piece(MOQ)
Advanced Programmable Logic Control System for Reliable Power Management
US$5,000.00
1 Set(MOQ)
Advanced Energy-Efficient Smart Pump Management System for Savings
US$88.00-102.00
1 Piece(MOQ)
Advanced Smart Home Remote Monitoring & Power Management System
US$5,000.00
1 Set(MOQ)
Intelligent Automatic Energy Power Management Systems for Online Energy Monitoring
US$10,000.00
1 Piece(MOQ)
L531 Advanced Control System for Three Phase Water Pump Management
US$59.90-74.90
1 Piece(MOQ)
OEM&ODM Electrical Control System, PLC Control Panel, Control System for Power Plant
US$1,868.00
1 Piece(MOQ)
Power Line Monitoring Control and Management System EMS Iot Based for Factory
US$10,000.00
1 Piece(MOQ)
TM3di8 Advanced Electrical Control System for Optimized Performance and Efficiency
US$28.00-32.00
1 Piece(MOQ)
Airts-Vm Wireless Remote Air Conditioning Control System
US$600.00-1,000.00
1 units(MOQ)



















