SourcingAI
Try for free
Powered by Made-in-China.com
Data-Driven Power Transformer Test System Ensures Traceability and Compliance with Advanced Management
US$150,000.00-700,000.00
1 Set

Product profile

After-sales Service

All Series

Warranty

1 Year

Max Diameter of Workpiece

Na

Model NO.

Test System

Mass Scope of Workpiece

>20000kg

Type

Power Transformer Test System

Maxcapacity

Na

Accuracy Grade

1

Load Way

Na

Loading Method

Na

Display

PC Software Display

Control

Computer Control

Weight

Depends on The Specific Situation.

Power Source

AC380V

Oil Cylinder Position

Na

Test Object

Power Transformers / Distribution Transformers / S

Data Acquisition

Multi-Channel High-Speed Data Acquisition

Safety Protection

Grid-Isolated Operation / Interlock Protection / E

Phase Control

Output Phase Sequence Configurable (Optional)

Standards

IEC 60076 / IEC 61439 / IEC 60947

Transport Package

Containerized Packing / Export Wooden Packing

Origin

China

Key features

Integrated Testing Platform: Combines automated logistics, intelligent control, and data management for efficient transformer testing.
Comprehensive Test Coverage: Supports routine, type, and special tests including no-load, load, impulse, and partial discharge tests.
High Accuracy Measurement: Ensures stable test performance with high-precision data acquisition and multi-channel analysis.
Modular & Customizable Design: Features modular configuration allowing easy expansion and flexible customization based on designs.
Advanced Safety Protection: Includes multi-level safety interlocks, grid-isolated operation, and interlock protection for high voltage.
1-Year Warranty Coverage: Provides a comprehensive 1-year warranty for all mechanical defects and performance issues.
Remote & On-site Support: Offers operation manuals, videos, remote training, and on-site engineer service when necessary.
Fast Response Time: Provides price quotes within 6 hours and prioritizes urgent inquiries for immediate assistance.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is your product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price?
A:
Usually provided within 6 hours once receiving an inquiry. If urgent, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, CIF, etc. Please select the most convenient and cost-effective option.
Q:What if I have difficulty using the equipment?
A:
We provide operation manuals, videos, and remote video training. If necessary, engineers will serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. Normal items usually take within 3 working days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like