SourcingAI
Try for free
Powered by Made-in-China.com
DC Hipot Test System Suitable for Both Laboratory and Field Testing Environments
US$100,000.00-1,000,000.00
1 Set

Product profile

After-sales Service

All Series

Warranty

1 Year

Max Diameter of Workpiece

<500mm

Model NO.

test system

Mass Scope of Workpiece

<900kg

Type

Transformer Testing

Maxcapacity

Na

Load Way

Electronic Load

Display

Digital

Control

Computer Control

Weight

100-500Kg

Power Source

AC220V

Oil Cylinder Position

Na

Product Type

High Voltage Test Equipment

Test Method

DC Hipot / DC Withstand Test

Output Type

DC High Voltage

Application

Power Cables, Surge Arresters, Transformers, Switc

Measurement

Voltage and Leakage Current

Control Mode

Digital Control

Compliance

IEC and Relevant Hv Test Standards

Customization

Available Upon Request

Transport Package

Export Standard Packaging

Specification

2500x1060x1500mm

Trademark

Launch

Origin

Shanghai. China

HS Code

8504349000

Key features

Advanced Control Technology: Adopts IGBT-based PWM control and intermediate-frequency voltage multiplication for high stability.
Wide Application Range: Suitable for testing power cables, surge arresters, generators, transformers, and switchgear.
Flexible Customization: Customization available upon request for product type, test method, and output type.
Comprehensive Warranty: Provides 1-year warranty coverage for all series of the DC Hipot Test System.
Remote Technical Support: Includes operation manuals, videos, and remote video call training for equipment usage.
Robust Build Quality: Designed for intermittent use with stable performance under demanding test conditions.
Standard Export Packaging: Equipped with standard export packing to ensure goods arrive without damage.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is the product quality?
A:
We are a manufacturer, so preferential price and high quality can guarantee.
Q:How soon can I get a price?
A:
Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will do in priority.
Q:What are your terms of delivery?
A:
EXW, FOB, CFR, CIF, etc. Please select your most convenient and cost effective.
Q:What if there is difficulty in using?
A:
We will first provide equipment operation manual, operation video, or provide training through remote video call. If necessary, engineers will serve on door.
Q:What is the leading time for production?
A:
That depends on order qty and product item. For normal items, usually within 3 working days. Delivery time is determined by the logistics, generally is 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like