SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Current Power Source Heat Cycle Test System for Thermal Performance Evaluation
US$100,000.00-1,000,000.00
1 Set

Product profile

After-sales Service

2year

Warranty

2year

Max Diameter of Workpiece

>3200mm

Model NO.

test system

Mass Scope of Workpiece

3000kg

Type

Transformer Testing

Load Way

Electronic Load

Display

Digital

Control

Computer Control

Weight

100kg~1000kg

Power Source

AC220V±10% 50Hz±2%

Product Type

Cable Test Equipment

Test Method

Heat Cycle / Heating Test

Application

Power Cables, XLPE Cables

Output Mode

High Current Heating

Compliance

IEC 60502 and Related IEC Standards

Customization

Available Upon Request

Transport Package

Export Standard Packaging

Specification

2500x1060x1500mm

Trademark

LQHV

Origin

Shanghai. China

HS Code

8504349000

Key features

IEC Standard Compliance: Complies with IEC 60502 and related IEC standards for power cable testing.
Heavy-Current Capability: Supports workpieces with max diameter >3200mm and mass up to 3000kg.
XLPE Cable Testing: Specialized for thermal performance and insulation reliability of XLPE cables.
Computer Control System: Features digital display and computer-controlled monitoring for high accuracy.
Comprehensive Warranty: Provides a 2-year warranty covering mechanical defects and parts.
Customization Available: Offers customization for product type, test method, and application upon request.
Rapid Response Support: Provides price quotes within 6 hours and remote video training support.
Safety Interlock System: Equipped with safety protection and interlock systems for secure operation.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period?
A:
We provide a 2-year warranty for our products.
Q:How quickly can I get a price quote?
A:
We usually provide prices within 6 hours of receiving your inquiry. For urgent requests, please call us for priority handling.
Q:What are your delivery terms?
A:
Our delivery terms include EXW, FOB, CFR, and CIF. Please select the option that is most convenient and cost-effective for you.
Q:What support is available if I encounter difficulties using the equipment?
A:
We provide operation manuals, videos, and remote video call training. If necessary, engineers can provide on-site service.
Q:What is the production lead time?
A:
For normal items, production usually takes within 3 working days. Delivery time depends on logistics and is generally 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Comprehensive Distribution Network Test Set for Current Systems
Made-in-China.com