SourcingAI
Try for free
Powered by Made-in-China.com
IGBT Harmonic Source for Transformer Factory Testing with Low Distortion Output
US$20,000.00-200,000.00
1 Set

Product profile

Output Type

Single

Warranty

1 Year

Output Power

Customized According to Test Requirements

Model NO.

test system

Input Voltage

Configurable According to Site Power Supply

Connection Mode

Terminal / Cable (Customizable)

Starting Mode

Self-excited Switching Power Supply

Voltage Regulating Mode

Electronic Regulation (IGBT-Based)

Power Supplying System

AC Power Supply (Customizable)

Energy Transmission

Electrical Energy Transmission (Customizable)

Modulation System

PWM Modulation (IGBT-Based)

Product Type

IGBT-Based Harmonic AC Power Source

Control Technology

IGBT Inverter, Digital Control

Application

Transformer Testing, Pd Testing, Dielectric & Indu

Voltage/Power Rating

Customizable as Per Customer Requirement

Frequency Range

Customizable as Per Customer Requirement

Control Mode

Manual/Automatic (Optional)

Standards

IEC/IEEE Test Applications(as Required)

Customization

Available Based on Customer Test Requirement

Transport Package

Containerized Packing / Export Wooden Packing

Origin

China

HS Code

903033900

Key features

Customizable Power: Output power and voltage are customizable according to specific test requirements.
Multi-Application Support: Suitable for transformer testing, PD testing, and induction withstand tests.
Advanced IGBT Technology: Utilizes IGBT inverter and PWM modulation for high-precision digital control.
High Voltage Capability: Step-up transformers support output voltages up to 120 kV for high-voltage tests.
Comprehensive Technical Support: Includes manuals, videos, remote training, and on-site engineer service if needed.
Fast Response Time: Price quotes provided within 6 hours; urgent inquiries handled with priority.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.25h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the quality and price advantage?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price quote?
A:
Usually within 6 hours of receiving the inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the most convenient and cost-effective option for you.
Q:What support is available if there are usage difficulties?
A:
We provide operation manuals, videos, and remote video training. If necessary, engineers will serve on-site.
Q:What is the production lead time?
A:
For normal items, usually within 3 working days. Delivery time depends on logistics, generally 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like