SourcingAI
Try for free
Powered by Made-in-China.com
Integrated Gas-Insulated Test Transformer System with Front Switchgear and Regulation Unit
US$20,000.00-200,000.00
1 Set

Product profile

After-sales Service

All Series

Warranty

1 Year

Connectors

Ethernet Cat 6

Model NO.

test system

Test Mode

All Series

Usage

Network Cable Tester, Digital Cable Tester

Test Region

Forming Cable

Cable Type

Forming Cable

Power

Na

Certification

CE

Customized

Customized

Color

All Series

Product Type

Gas-Insulated High Voltage Test Transformer

Insulation Medium

Sf6 Gas Insulated

Test Voltage Type

AC Power Frequency

Application

Power Cable and High Voltage Equipment Testing

Partial Discharge

Low Partial Discharge Design (Customizable)

Transport Package

Containerized Packing / Export Wooden Packing

Specification

2500x1060x1500mm

Trademark

Launch

Origin

China

HS Code

903033900

Key features

SF6 Gas Insulation: Uses SF6 gas as insulation medium for excellent dielectric strength in space-constrained areas.
Integrated System Design: Combines switchgear, transformer, regulator, and PLC control in a single container tank.
High Voltage Capability: Rated output voltage of 300kV with 300kVA capacity for power cable testing.
Customizable Options: Offers full customization, minor customization, and customization from samples or designs.
Remote Technical Support: Provides operation manuals, videos, and remote video call training for equipment usage.
Fast Response Time: Price quotes provided within 6 hours; urgent inquiries handled with priority.
Standard Export Packing: Equipped with standard export packaging to ensure goods arrive without damage.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is your product quality?
A:
We are a manufacturer, so preferential price and high quality can guarantee.
Q:How soon can I get a price?
A:
Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will do in priority.
Q:What are your terms of delivery?
A:
EXW, FOB, CFR, CIF, etc. Please select your most convenient and cost effective.
Q:What if there is difficulty in using the equipment?
A:
We will first provide equipment operation manual, operation video, or provide training through remote video call. If necessary, engineers will serve on door.
Q:What is the leading time for production?
A:
That depends on order qty and product item. For normal items, usually within 3 working days. Delivery time is determined by the logistics, generally is 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Resonant Test System for Gis Breaker and Cable (500KV/500kVA)
Made-in-China.com
Variable Frequency AC Resonance Test System

Variable Frequency AC Resonance Test System

US$1,624.00-29,760.00
1 Set(MOQ)
Made-in-China.com