Powered by Made-in-China.com
Integrated Power Transformer Loss and Impedance Measurement System for Substation
US$150,000.00-700,000.00
1 Set
Product profile
After-sales Service
All SeriesWarranty
1 YearMax Diameter of Workpiece
NaModel NO.
1Mass Scope of Workpiece
>20000kgType
Power Transformer Test SystemMaxcapacity
NaAccuracy Grade
1Load Way
NaLoading Method
NaDisplay
PC Software DisplayControl
Computer ControlWeight
Depends on The Specific Situation.Power Source
AC380VOil Cylinder Position
NaTest Object
Power Transformers / Distribution Transformers / SData Acquisition
Multi-Channel High-Speed Data AcquisitionSafety Protection
Grid-Isolated Operation / Interlock Protection / EPhase Control
Output Phase Sequence Configurable (Optional)Standards
IEC 60076 / IEC 61439 / IEC 60947Transport Package
Containerized Packing / Export Wooden PackingSpecification
2500x1060x1500mmTrademark
launchOrigin
ChinaKey features
Integrated Testing Platform: Combines automated logistics, intelligent control, and data management for efficient transformer testing.
Comprehensive Test Coverage: Supports routine, type, and special tests including no-load, load, impulse, and partial discharge tests.
High Accuracy Measurement: Ensures stable test performance with high-precision data acquisition and multi-channel monitoring.
Modular & Customizable Design: Features modular configuration allowing easy expansion and customization of test stations.
Advanced Safety Protection: Includes grid-isolated operation, interlock protection, and multi-level safety interlocks for high-voltage safety.
Automated Workflow Control: Utilizes PLC-based centralized control and automated switching to streamline testing sequences.
Compliance with International Standards: Fully compliant with IEC 60076, IEC 61439, and IEC 60947 standards for power transformers.
1-Year Warranty Coverage: Provides a comprehensive 1-year warranty for all mechanical and electrical components.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T
About Our Factory & Business Background
Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How is your product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price quote?
A:
Usually provided within 6 hours of receiving an inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the most convenient and cost-effective option for you.
Q:What if I have difficulty using the equipment?
A:
We provide operation manuals, videos, and remote training. If necessary, engineers can serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. Normal items usually take within 3 working days.
Send Inquiry
*To:
Shanghai Lanqi Electric Co., Ltd.
Shanghai Lanqi Electric Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
OEM Transformer Test System Supplier for Electrical Equipment Manufacturers and Utilities
US$5,000.00-70,000.00
1 Set(MOQ)
Transformer Test System Measurement of No-Load Loss and Current
US$5,400.00-79,000.00
1 Set(MOQ)
High Precision Transformer Integrated Test System with 0.2% Accuracy for No-Load Loss, Load Loss & DC Resistance Measurement
US$5,000.00-70,000.00
1 Set(MOQ)
Transformer Comprehensive Test System for Resistance, Ratio, No-Load and Load Loss Measurement
US$5,000.00-70,000.00
1 Set(MOQ)
Insulating Oil Dielectric Loss Factor and Resistivity Measurement System for Power Industry
US$3,570.00-3,999.00
1 sets(MOQ)
OEM Motor Test System for Torque Speed Efficiency and Power Measurement Applications
US$3,000.00-98,000.00
1 Piece(MOQ)
5kVA 50kv Pd Free AC Hipot Tester Oil Immersed Hv Test Transformer Partial Discharge Measurement System for Substation
US$8,900.00-89,000.00
1 Set(MOQ)
Power Frequency Non-partial Discharge Withstand Voltage Test System for Transformers and Breakers
US$9,528.00-18,671.00
1 sets(MOQ)
Power Frequency Parameter Test System for Positive and Zero Sequence Impedance Capacitance
US$16,000.00-16,599.00
1 sets(MOQ)
Substation Overhead Line Impedance Measurement All-in-One Test System Transmission Line Frequency Parameter Test System
US$4,860.00-15,000.00
1 Set(MOQ)
High Precision Synchronous Motor Test System for Industrial Power Equipment Performance and Stability Analysis Laboratory
US$3,000.00-98,000.00
1 Piece(MOQ)
Integrated Automatic Testing System for Power Transformer and Induction Regulator
US$5,000.00-35,000.00
1 Piece(MOQ)
Integrated Vehicle Drive Motor Test System for E Axle Performance Validation and Automotive Engineering Projects
US$3,000.00-98,000.00
1 Piece(MOQ)
Power Transformer Comprehensive Test System for Factory Production Line and IEC Type Tests
US$150,000.00-700,000.00
1 Set(MOQ)
110kv Power Cables and Transformer AC Withstand Voltage Tester Variable Frequency AC Resonant Test System 30-300Hz
US$8,000.00-40,000.00
1 Piece(MOQ)
Integrated Distribution and Power Transformer Comprehensive Test System
US$150,000.00-700,000.00
1 Set(MOQ)
Wuhan Lightning Impulse Voltage Testing System for Power Transformer Ep Hipot Electric
US$3,968.00-92,158.00
1 Set(MOQ)
Integrated Power Transformer Test System for Transformer No-Load Test
US$6,000.00-120,000.00
1 Set(MOQ)



















