SourcingAI
Try for free
Powered by Made-in-China.com
Multi-Functional AC Converter for Various Transformer AC Test Power Needs
US$15,000.00-200,000.00
1 Set

Product profile

Output Type

Single

Warranty

1 Year

Output Power

Customized According to Test Requirements

Model NO.

test system

Input Voltage

Configurable According to Site Power Supply

Connection Mode

Terminal / Cable (Customizable)

Starting Mode

Self-excited Switching Power Supply

Voltage Regulating Mode

Electronic Regulation (IGBT-Based)

Power Supplying System

AC Power Supply (Customizable)

Energy Transmission

Electrical Energy Transmission (Customizable)

Modulation System

PWM Modulation (IGBT-Based)

Application

Transformer Testing

Voltage & Frequency Control

Precise and Independent

Control Mode

Local / PLC / Remote (Optional)

Operation Mode

Manual and Automatic

Rated Capacity/Current/Output Voltage

Customizable

Output Frequency

Variable / Configurable

Thd

Depending on Configuration

Transport Package

Containerized Packing / Export Wooden Packing

Origin

China

HS Code

903033900

Key features

IGBT-Based Variable Frequency: Designed with IGBT technology for precise voltage and frequency control with low distortion sine-wave output.
Customizable Output Power: Output power can be customized according to specific test requirements.
Configurable Input Voltage: Input voltage is configurable to match various site power supply conditions.
Flexible Connection Mode: Supports terminal or cable connection modes with customizable options.
Comprehensive Protection System: Features optical-fiber communication and comprehensive protection for safe operation.
Wide Frequency Range: Output frequency ranges from 50 to 200 Hz to support various transformer tests.
Remote Operation Capability: Supports local, PLC, or remote control modes for flexible operation.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is your product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price quote?
A:
We usually provide quotes within 6 hours of receiving an inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the most convenient and cost-effective option for you.
Q:What if I have difficulty using the equipment?
A:
We provide operation manuals, videos, and remote video training. If necessary, engineers can serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. For normal items, it is usually within 3 working days. Delivery generally takes 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like