SourcingAI
Try for free
Powered by Made-in-China.com
Transformer Frequency Response Tester Tests The Frequency Response of Transformers to Detect Mechanical Winding Issues
US$2,000.00-20,000.00
1 pc

Product profile

After-sales Service

All Series

Warranty

All Series

Max Diameter of Workpiece

<500mm

Mass Scope of Workpiece

<900kg

Type

Tensile Testing Machine

Maxcapacity

Na

Accuracy Grade

0.5

Load Way

Na

Loading Method

Na

Display

Digital

Control

Computer Control

Weight

0-100Kg

Power Source

AC220V

Oil Cylinder Position

Na

Product Type

Electrical Measuring Instruments

Application

Power System Testing and Diagnostics

Test Functions

Insulation, Transformer, and Oil Testing

Voltage Class

Medium & High Voltage

Standards

IEC / IEEE Compliant

Transport Package

Containerized Packing / Export Wooden Packing

Origin

China

HS Code

903033900

Key features

Comprehensive Testing Functions: Tests frequency response, capacitance, dielectric loss, oil breakdown voltage, and partial discharge.
High Precision Accuracy: Accuracy grades up to 0.1% with resolving power of 0.001% for tan delta and 0.001pF for capacitance.
Wide Voltage Range: Supports output voltages from 0.5KV to 100KV with step adjustments for various high-voltage applications.
IEC and IEEE Compliant: All test functions and standards strictly adhere to IEC and IEEE international safety and performance standards.
Advanced Frequency Analysis: Performs FRA with 2000 scan frequency points to detect internal winding deformation in transformers.
Portable and Battery Powered: Built-in 12.6V/4.8AH lithium battery allows for field testing without external power sources.
Multi-Channel Measurement: Features 2 independent measurement channels with 12-bit sampling accuracy and 100MHz sampling rate.
Flexible Customization: Offers full customization, minor customization, and flexible customization options based on samples or designs.

Company profile

Shanghai Lanqi Electric Co., Ltd.
Years of Export ExperienceFlexible CustomizationQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T

About Our Factory & Business Background

Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How is your product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price quote?
A:
Usually provided within 6 hours once receiving an inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, CIF, etc. Please select the most convenient and cost-effective option for you.
Q:What if I have difficulty using the equipment?
A:
We first provide operation manuals, videos, or remote video training. If necessary, engineers will serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. For normal items, usually within 3 working days. Delivery takes 5-7 days.

Send Inquiry

*To:Shanghai Lanqi Electric Co., Ltd.Shanghai Lanqi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like