Powered by Made-in-China.com
Unmanned Production Line Power Transformer Test System Maximizing Operational Safety
US$150,000.00-700,000.00
1 Set
Product profile
After-sales Service
All SeriesWarranty
1 YearMax Diameter of Workpiece
NaModel NO.
Test SystemMass Scope of Workpiece
>20000kgType
Power Transformer Test SystemMaxcapacity
NaAccuracy Grade
1Load Way
NaLoading Method
NaDisplay
PC Software DisplayControl
Computer ControlWeight
Depends on The Specific Situation.Power Source
AC380VOil Cylinder Position
NaTest Object
Power Transformers / Distribution Transformers / SData Acquisition
Multi-Channel High-Speed Data AcquisitionSafety Protection
Grid-Isolated Operation / Interlock Protection / EPhase Control
Output Phase Sequence Configurable (Optional)Standards
IEC 60076 / IEC 61439 / IEC 60947Transport Package
Containerized Packing / Export Wooden PackingOrigin
ChinaKey features
Unmanned Operation: Automated logistics and intelligent control enable unmanned or minimally manned testing.
High Accuracy: Accuracy Grade 1 ensures precise measurement and stable test performance.
Comprehensive Safety: Grid-isolated operation, interlock protection, and multi-level safety interlocks.
Modular Configuration: Easy to expand and customize for routine and type tests of power transformers.
Wide Voltage Range: Supports 66kV to 500kV power transformers with various test capacities.
Full Test Coverage: Covers routine, type, and special tests including DGA, partial discharge, and impulse.
Data Management: PC software display with multi-channel high-speed data acquisition and reporting.
IEC Standards Compliance: Meets IEC 60076, IEC 61439, and IEC 60947 standards for global compliance.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 Years CertifiedNearest Port: Shanghai PortAverage Response Time: >24h CertifiedTerms of Payment: T/T
About Our Factory & Business Background
Address127d, Building 7, No. 438 Xinnongpuyin Road, Zhujing Town, Jinshan District, 201599 Shanghai, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsPartial Discharge Test, High Voltage Tester, AC Hipot Tester, DC Hipot Tester, Impulse Voltage Generator, High Voltage Insulation Equipment, Transformer Testing Instrument
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2011-04-27
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How is your product quality?
A:
We are a manufacturer, so we can guarantee preferential prices and high quality.
Q:How soon can I get a price?
A:
Usually provided within 6 hours of receiving an inquiry. For urgent requests, please call us for priority handling.
Q:What are your terms of delivery?
A:
We offer EXW, FOB, CFR, and CIF. Please select the most convenient and cost-effective option.
Q:What if I have difficulty using the equipment?
A:
We provide operation manuals, videos, and remote video training. If necessary, engineers will serve on-site.
Q:What is the lead time for production?
A:
It depends on order quantity and product item. Normal items usually take within 3 working days.
Send Inquiry
*To:
Shanghai Lanqi Electric Co., Ltd.
Shanghai Lanqi Electric Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High Voltage Switchgear Production Line Test System for Routine Inspection
US$2,299.00-2,399.00
1 sets(MOQ)
Automatic Transformer Test Bench Power Transformer Factory Ex-Works Test System
US$4,890.00-68,990.00
1 Set(MOQ)
Automatic Transformer Comprehensive Test System for Distribution and Power Transformers Test Bench Manufacturer
US$5,000.00-70,000.00
1 Set(MOQ)
Automated Compressor Motor Test System for Industrial Production Line Quality Control and Performance Evaluation Solution
US$3,000.00-9,800.00
1 Piece(MOQ)
Terek Computer Safe Valve Test with Safety Valve Clamping Power System
US$15,500.00-16,500.00
1 Piece(MOQ)
Transformer Test Bench Short Circuit Test (SC Test) Load Losses Test System
US$4,890.00-68,990.00
1 Set(MOQ)
36kv Power Transformer Lightning Impulse Withstand Test System
US$1,000.00-5,000.00
1 Set(MOQ)
240kv Hv AC Power Frequency Series Resonant Test System for Transformer AC Withstand Voltage Testing
US$1,000.00-30,000.00
1 Set(MOQ)
Power or Distribution Transformer 400kv Impulse Voltage Generator Test System
US$50,000.00
1 Piece(MOQ)
Advanced Industrial Motor Test System for OEM Manufacturing and Automated Production Line Testing Solution
US$3,000.00-9,800.00
1 Piece(MOQ)
35kv Power Cable Transformer High Voltage Testing Machine AC Resonance Test System
US$2,990.00-7,200.00
1 Set(MOQ)
Power Transformer Test System with Excitation Current Measurement
US$5,400.00-79,000.00
1 Set(MOQ)
Multi-Functional High Voltage No Partial Discharge Test System for Transformer Power Cables
US$9,528.00-18,671.00
1 sets(MOQ)
Power Frequency Non-partial Discharge Withstand Voltage Test System for Transformers and Breakers
US$9,528.00-18,671.00
1 sets(MOQ)
HVHIPOT GDBT-10000kVA 36kV Transformer Test System Power Transformer Factory Test System
Negotiable
1 Piece(MOQ)
Multi-functional No Partial Discharge Test System for Transformer Power Cables / Circuit Breaker
US$9,528.00-18,671.00
1 sets(MOQ)
110kv Power Cables and Transformer AC Withstand Voltage Tester Variable Frequency AC Resonant Test System 30-300Hz
US$8,000.00-40,000.00
1 Piece(MOQ)
Power Transformer Test System for Production Line Testing
US$150,000.00-700,000.00
1 Set(MOQ)



















