SourcingAI
Try for free
Powered by Made-in-China.com
Engine Fan Drive Idler Hub 3042770 Automatic Belt Tension Control Spare Replacement Component
US$45.00
1-9 Pieces
US$43.00
10-99 Pieces
US$39.00
100+ Pieces

Product profile

Customization

Available

Certification

CCC, COP, ISO9001, CE, E-Mark, RoHS, TS16949

Standard Component

Standard Component

Model NO.

3042770

Technics

Forging

Material

Iron

Type

Fan Idler Assembly

Transport Package

Carton Packing

Specification

Standard

Trademark

Non Brand

Origin

China

HS Code

8409999990

Key features

Automatically adjust belt tension avoid fan belt slipping under heavy load operation
Stable control cooling fan running state effectively prevent engine overheating failure
High-strength alloy structure wear resistant long service life for harsh working conditions
Exact OEM dimension 3042770 direct mounting without extra modification
Sealed high-temperature bearing reduce running noise and extend belt service cycle

Company profile

Importers and ExportersR&D CapabilitiesQA/QC InspectorsHigh Repeat Buyers Choice
Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: >24h

About Our Factory & Business Background

AddressNo. 330, Xinxing Road, Development Zone, Nantong, Jiangsu, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDiesel Engine, Fuel Pumps, Fuel Injectors, ECU, Tensioners, Cylinder Head, Crankshaft, Belts, Gaskets
Own BrandYes

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Oceania

Product Q&A

Q:What engine series do you supply?
A:
We supply engine series including QSB, 6BT, 6CT, ISL, QSZ, ISF, QSF, 4BT, 6CT, ISBe, ISLe, QSM, ISM, QSL, QSB, QSX, ISX, KTA, QSK, NTA, and N.
Q:Do you offer customization services?
A:
Yes, we provide customization services for both products and packaging to meet your specific needs.
Q:What is the lead time for delivery?
A:
The lead time is within 15 workdays for both peak season and off-season.
Q:What information is needed for an engine inquiry?
A:
For engines, please provide the engine model, serial number, or engine nameplate information.
Q:What information is needed for a parts inquiry?
A:
For parts, please provide the product name, part number, and the required quantity.

Send Inquiry

*To:Jiangsu Hongxin Semiconductor Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Drive Shaft Center Support Repair Components
Made-in-China.com
Genuine New Engine Cylinder Block Standard Component
Made-in-China.com
Grf Ge 7fdl Diesel Engine Components 117X1062
Made-in-China.com