SourcingAI
Try for free
Powered by Made-in-China.com
Industrial Prefabricated Building Metal Frame Steel Structure Warehouse
US$20.00-35.00
200 Square Meters

Product profile

Customization

Available

After-sales Service

Online Support/24 Hours Quotation

Connection Form

Bolt Connection

Model NO.

HXIWH-401

Feature

Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable

Install

Online Guidance

Application

Manufacturing Plants, Heavy and Light Industrial W

Advantage

Heat Insulation/Fireproof/Eco Friendly

Roof & Wall Color

White/Blue/Red/Green/Customizable

Project Capability

Total Solution for Projects/One-Stop Solution

Tolerance

±1%

Pillar & Beams

C Type Steel

Steel Surface

Galvanize or Painted

Roof/Wall Material

Sandwich Panel/Corrugated Steel Sheet

Door

Sliding Sandwich Panel Door

Window

PVC or Aluminium Window

Product Type

Steel Structure

Product Name

Galvanized Steel Frame Factory Buildings

Steel

High Strength Steel

Warranty

30 Year Limited Warranty

Transport Package

as Per Customer´S Requirements

Specification

Q235B/Q345/Q355

Trademark

Hongxing BuildTech

Origin

China

HS Code

7308900000

Production Capacity

500000tons/Year

Key features

30-Year Limited Warranty: Comprehensive coverage for 30 years, ensuring long-term reliability and peace of mind.
Customizable Roof & Wall Colors: Available in White, Blue, Red, Green, or fully customized to match your brand.
High-Strength Steel Frame: Constructed with Q345/Q355B steel for superior load-bearing capacity and durability.
Anti-Corrosion Protection: Options include hot-dip galvanizing and anti-corrosion paint for harsh environments.
Earthquake & Wind Resistant: Engineered for seismic zones and high-wind areas with reinforced internal structures.
Fast Installation: Prefabricated design allows erection in 4-8 weeks, significantly faster than concrete.
Large Clear Span: Achieves up to 36 meters clear span without interior columns for maximum flexibility.
ISO 9001 Certified Quality: Manufactured under strict quality control with SGS testing for global acceptance.

Company profile

Beijing Hongxing Shuzao Building Materials Co., Ltd.
In-stock CapacityFast DeliveryQuality AssuranceManagement Certification
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2025-04-10Nearest Port: TianjinAverage Response Time: ≤4.66hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): EXW, CFR, CIF, FOB

About Our Factory & Business Background

Address2643, 1st Floor, No. 6 Min'an Road, Changziying Town, Daxing District, Beijing, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Factory Building, Steel Structure Warehouses & Workshops, Steel Structure Multi-Story Steel Frame, Steel Frame for Distribution Center, Steel Structure Multi-Span Steel Frame, Steel Structure Poultry Farm, Steel-Framed Office Building, Steel Structure Parking Building, Prefabricated Warehouse, Pre-Engineered Steel Building

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001

Product Q&A

Q:Are you a factory or trading company?
A:
We are a direct factory. Our sales dept is located in Beijing. Factory site is located at the premier steel production hub renowned for supplying most of the nation's steel output, Hebei, China.
Q:What is the delivery time?
A:
Standard processing time is 30-45 days following deposit receipt. The majority of our steel building projects are delivered and erected within 7-8 weeks, though this timeline may vary depending on factors such as stock availability, weather conditions, and other project-specific considerations.
Q:What is the maximum clear span for a steel structure warehouse?
A:
Our clear span steel warehouse can achieve up to 36 meters without interior columns, maximizing usable storage space and operational flexibility for logistics centers.
Q:How long does it take to construct a prefabricated steel warehouse?
A:
As a prefabricated steel warehouse solution, our structures can be erected in 4-8 weeks depending on size, significantly faster than traditional concrete construction.
Q:What steel grades are used for industrial steel warehouses?
A:
We use high-strength Q355B steel for main frames, providing excellent load-bearing capacity for heavy steel warehouse applications.

Send Inquiry

*To:Beijing Hongxing Shuzao Building Materials Co., Ltd.Beijing Hongxing Shuzao Building Materials Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like