Powered by Made-in-China.com
Hypile LSAW Steel Pipe for Bridge Pier Piling Foundation Structural Construction Large Diameter Longitudinal Submerged Arc Welded Steel Pipe Pile
US$580.00
1 Ton
Sample price:US$100.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
24 MonthsModel NO.
lsawSurface Treatment
Anti-Rust Painting, 3PE,Epoxy, Gi, Glassfake EpoxyStandard
En 10219 S275jr, S355jr, S355joh, S420, S460Trader Term
EXW, Fca, Fob, CFR, CIF, CIP DDU, DDPInspection
in-House Lab, SGS, TUV, BV, ABS...Thickness
8 - 230mmLength
0.1 - 100mTransport Package
Bulk PackingSpecification
OD 355.6MM - 7000MMTrademark
HYPILEOrigin
ChinaProduction Capacity
450000 Tons / YearKey features
Large Diameter Capacity: Outer diameter ranges from 168.3mm up to 7000mm for massive structural needs.
Extreme Thickness Range: Wall thickness available from 3mm to 230mm for heavy-duty load bearing.
Comprehensive Steel Grades: Supports ASTM, EN, JIS, and Chinese standards including Q355, S355, X80.
Multi-Process Manufacturing: Offers Seamless, ERW, LSAW, SSAW, and Roller Welded pipe production.
In-House Quality Lab: Conducts RT, UT, MPT, PT, and Hydrostatic testing for strict quality control.
Advanced Anti-Corrosion: Surface treatments include 3PE, Epoxy, GI, and Glassflake Epoxy coatings.
Global Logistics Network: Secure multi-modal shipping via rail, air, and ocean with specialized packaging.
24-Month Warranty: Provides a 24-month warranty against defects with technical support included.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Nearest Port: TIANJIN, SHANGHAI, QIANGDAOAverage Response Time: ≤2.19hTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 13-208, Hengtai Road, Daqiuzhuang Town, Jinghai District, Tianjin, China
Plant Area405 square meters
Number of Employees28
International Commercial Terms(Incoterms)FOB, CIP, EXW, CPT, CFR, CIF, FCA, DAT, FAS, DDP, DAP
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsSpiral Steel Pipe, Sheet Piling, Welded Steel Pipe, Pipe Piling, Steel Piles, Seamless Steel Pipe, Steel Beams, Helical Screw Pile, Steel Tie Rod, PC Strand
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2019-06-25
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product Q&A
Q:What types of steel pipes do you supply?
A:
We supply Seamless, ERW, LSAW, SSAW, and Roller Welded pipes in carbon and alloy steel for oil/gas, construction, and infrastructure.
Q:Which steel standards and grades are supported?
A:
We support ASTM A252/A500/A53/A572/A709/A588/A36, EN 10219/10210, JIS, SPEC 5L, and Chinese grades like Q235B/Q355B.
Q:What is the typical lead time for orders?
A:
Typically 15-45 days for standard orders, depending on quantity and specifications. Peak season takes one month; off-season is within 15 workdays.
Q:How are the pipes packaged for export?
A:
Pipes are bundled with steel straps, wrapped waterproofly, and fitted with end protectors. Custom crating is available.
Q:What quality certifications and inspections are provided?
A:
We hold ISO 9001, ISO 45001, and ISO 14001. We provide Mill Test Certificates and accept third-party inspections from SGS, TUV, ABS, and BV.
Send Inquiry
*To:
Tianjin Hypile Foundation Engineering Co.,Ltd
Tianjin Hypile Foundation Engineering Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Large Diameter 12-50m SSAW Carbon Steel Spiral Welded Pipe for Jetty Construction
US$500.00-560.00
50 Tons(MOQ)
Hypile ASTM A106 Schedule40 Seamless Steel Pipe for Structural Fabrication Projects
US$500.00-600.00
25 Tons(MOQ)
En10219 S355joh SSAW Pipe for Building and Bridge Support
US$500.00-600.00
25 Tons(MOQ)
Spec 5L 2W Gr 50 Roller Welded LSAW Steel Pipe for Bridge Construction
US$580.00
1 Ton(MOQ)
High Strength Low Alloy Welded Steel Pipe for Lightweight Structural Applications in Bridge Building
US$1,290.00-2,890.00
1 Ton(MOQ)
Factory Supply Polished Finish 304 Seamless Pipe Piles for Structural Piling
US$1,960.00-2,100.00
5 Tons(MOQ)
ASTM A252 Grade 3 Spiral Welded Steel Piling Pipe for Deep Foundation
US$480.00-600.00
25 Tons(MOQ)
Q235B Spiral Steel Pipe for Building Foundation Piling with Sy/T 5040
US$580.00-650.00
25 Tons(MOQ)
Heavy Wall Thickness Seamless Carbon Steel Structural Pipe for Bridge Piling
US$630.00-740.00
1 Ton(MOQ)
S275jr S355joh S355j2h Jcoe Sawl LSAW Double Seam Arc Welded Carbon Steel Line Pipes for Piling Tubular
US$730.00-1,700.00
25 Tons(MOQ)
Manufacture Sch10 1inch 60.3mm 3.2mm LSAW Welded Pipe for Shipbuilding Scaffolding Piling and Foundation
US$300.00-500.00
50 Tons(MOQ)
Hypile En 10217 S235j2h LSAW Steel Pipe for Port Facilities
US$1,100.00-4,200.00
1 Ton(MOQ)
Carbon Steel 323.9mm 6.5mm Sch10 1inch Welded Round Pipe for Piling and Foundation
US$300.00-500.00
50 Tons(MOQ)



















