SourcingAI
Try for free
Powered by Made-in-China.com
High-Efficiency Floor Standing EV Charging Station Ocpp 1.6j
US$720.00
1-19 Pieces
US$690.00
20-99 Pieces
US$620.00
100-199 Pieces
US$580.00
200+ Pieces
Sample price:US$720.00/piece.Request sample

Product profile

Customization

Available

Connector Type

Type 2

Start Mode

APP Control, Book Charging, Remote Control, RFID Card

Model NO.

CXE-A22E

Number of Charging Interfaces

One Pile with Multiple Charges

Location

Both

Installation

Floor Type

Charge Method

Normal Charge

Transport Package

Yes

Specification

47x30x150

Trademark

chaoxiang

Origin

China

Key features

OCPP 1.6J Protocol: Supports OCPP 1.6J standard for smart control and remote management.
Multiple Start Modes: Offers Plug-and-play, RFID card, and APP control options.
High Power Options: Available in 3.5kW, 7kW, 11kW, and 22kW rated power configurations.
Comprehensive Safety: Includes emergency stop, surge protection, and built-in RCD for DC leakage.
Custom Logo Service: Supports custom printing on logo, package, plug, and cable with MOQ.
Durable Construction: Metal plate shell with powder coating and IP54 protection rating.
Flexible Communication: Features WIFI, Ethernet, and optional 4G connectivity.
Smart Display: 4.3-inch LCD screen displays voltage, current, power, and fault info.

Company profile

Zhejiang Chaoxiang New Energy Co., Ltd.
Importers and ExportersHigh Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai Port, Ningbo PortAverage Response Time: ≤1.17h

AI-Powered supplier vetting

SummaryChaoxiang New Energy is engaged in the intelligent charging industry, with significant production capabilities and a strong emphasis on R&D. The company holds ISO9001 and ISO14001 certifications and offers extensive customization services. However, it lacks overseas warehouses and exhibition participation, which may limit its global reach. Financial data is present but lacks context, making a full assessment challenging. Overall, the company appears well-positioned in the domestic market, particularly in new energy infrastructure.
Supplier typeChaoxiang New Energy is a professional technical supplier in the intelligent charging industry, offering 3D software design and extensive customization options.
CertificationsThe supplier holds ISO9001:2015 and ISO14001:2015 certifications, indicating adherence to quality and environmental management standards.
R&D capabilityThe supplier has introduced new products in the past year and offers ODM and OEM services, indicating strong innovation and development capabilities.
Production capacityThe supplier has significant production capabilities with multiple charging pile production lines and an annual capacity of over 1 million units.
Customization capabilityThe supplier offers a wide range of customization services, including full and flexible customization from samples and designs.

Product Q&A

Q:Are you trading company or manufacturer?
A:
We are source factory of EV chargers and has been recognized by national high-tech enterprises and has more than 100 patented technologies.
Q:How can we guarantee quality?
A:
Always a pre-production sample before mass production; All mainbord are tested before assembly and each charger is fully tested before shipped.
Q:How long is the lead time?
A:
The lead time is 5-30 working days, it depends on the quantity, storage status and production scheduling.
Q:What kinds of payment do you accept?
A:
We have T/T and L/C etc. If you need the detailed terms of payment, pls contact us.
Q:How long to fully charge a car?
A:
To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h,obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Send Inquiry

*To:Zhejiang Chaoxiang New Energy Co., Ltd.Zhejiang Chaoxiang New Energy Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Advanced 14kw Smart Ocpp 1.6j EV Charging Station
Made-in-China.com
High Efficiency DC Fast Charging Station for Evs

High Efficiency DC Fast Charging Station for Evs

US$1,022.00-5,006.00
1 Piece(MOQ)
Made-in-China.com