Powered by Made-in-China.com
Artisanal and Small Scale Mercury Free Gold Processing Equipment
US$8,000.00-30,000.00
1 set
Sample price:US$10000.00/set.Request sample
Product profile
Customization
AvailableType
Gold Modular PlantFunction
Gold RecoveryCertificate
ISO9001,SGSProcessing
Gravity SeparationProduct
Gold BarApplication
Small Scale Gold MiningDriving
Electric Motor, EngineVoltavge
127/220V,220/380V,230/400V,240/415V,400/690VFree Gold Recovery Rate
85-97%Processed Raw Materials
Gold OreMounted Type
Portable, Mobile, Skid, FixedWarranty Period
365 DaysColor
Multi, SelectableTransport Package
ContainerizedSpecification
VariousTrademark
HZEOrigin
ChinaHS Code
8474809090Production Capacity
5 Lines/YearKey features
Mercury-Free Processing: Uses gravity separation without mercury or chemicals for environmental protection.
High Recovery Rate: Achieves 85-97% free gold recovery rate with optimized shaking table design.
Quick Installation: Pre-connected components allow full installation and commissioning in just 2 hours.
Portable & Modular: Skid-mounted structure fits in containers, easy to move between mining sites.
Customizable Drive: Driving mode can be electric motor, diesel engine, or customized per customer needs.
Durable Wear Parts: Wearing parts made of high wear-resistant alloy steel for extended service life.
Laser-Cut Precision: Hammer mill sieve slots are laser-cut for high precision and selectable sizes.
365-Day Warranty: Comprehensive 365-day warranty period covering mechanical defects and support.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤10.91hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What is the gold recovery rate of this equipment?
A:
The plant achieves a free gold recovery rate of 85-97%, with gravity concentration recovery up to more than 95%.
Q:Is the equipment environmentally friendly?
A:
Yes, it uses gravity separation processes without mercury or other chemicals, making it safe for health and the environment.
Q:How long does it take to install the plant?
A:
The plant is pre-connected before ex-work, allowing for easy transportation and quick installation and commissioning in just 2 hours.
Q:Can the driving mode be customized?
A:
Yes, the driving mode can be freely selected as electric motors or diesel engines, or customized according to customer needs.
Q:What is the warranty period for this equipment?
A:
We provide a 365-day warranty period for the equipment.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Small Scale Hard Rock and Alluvial Gold Mining Processing Equipment
US$3,000.00-5,000,000.00
1 Piece(MOQ)
Alluvial Mining and Hard Rock Small Scale Gold Processing Equipment
US$3,000.00-5,000,000.00
1 Piece(MOQ)
Small Scale Gold Mining Equipment for Rock Stone Gold Plant
US$19,000.00-20,000.00
1 Piece(MOQ)
Small Scale Portable Modular Gold Artisanal Mining Processing Equipment
US$8,000.00-400,000.00
1 set(MOQ)
Portable Small Scale Free Gold Gravity Separation Processing Equipment
US$8,000.00-30,000.00
1 set(MOQ)
High-Performance Granite and Marble Quarrying Equipment for Efficient Large-Scale Stone Extraction – Ideal for Quarry Mining
US$22,000.00-25,000.00
1 Piece(MOQ)
Rock Gold Mineral Processing Plant Mining Equipments From Gandong/Jiangxi Well-Tech International Mining Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Gold Mineral Processing Plant Mining Equipments From Gandong
US$19,000.00-20,000.00
1 Piece(MOQ)
Explosion-Proof Diesel Engine Toothed Track Locomotives Are Used as Material Transportation Equipment in Underground Coal Mines and Gold Mines
US$640,000.00-650,000.00
1 Piece(MOQ)
Mining Equipment for Gold, Copper, Lead&Zinc, Alluvial Gold, etc
US$12,300.00
1 Set(MOQ)
Mechanical Bucket Snatch Car Are Used for Small Space Handling in Advanced Single Column Hydraulic Supports Are Used for Coal Mine Equipment
US$210,000.00-220,000.00
1 Piece(MOQ)
Stone Gold Plant Complete Set Machine Include Water Pump Slurry Pump All Auxiliary Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Wanrun Hot Sale Portable Gold Mining Equipment with Trommel for River and Stream Operations
US$4,509.59
1 Piece(MOQ)
Premium Underground Gold Mining Equipment with Rotary Kiln
US$126.00
1 Piece(MOQ)
High-Precision Three-Head Agate Grinder Lab Small-Scale Mineral Grinding Equipment
US$3,700.00-3,880.00
1 Piece(MOQ)
Ebz135z Cantilever Tunnel Roadheader Machine and Special Equipment for Underground Mining in Coal Mines
US$730,000.00-740,000.00
1 Piece(MOQ)
Gold Finding Equipment Black Sand Shaking Tables for Gold Processing Plant High Recovery
US$1,200.00-1,260.00
1 Piece(MOQ)
Gold Mining Equipment for Rubber Belt Vacuum Filter
Negotiable
1 Piece(MOQ)
Advanced Durable Equipment for Limestone Processing and Handling
US$12,800.00-999,999.00
1 Set(MOQ)
Advanced Equipment for Mining Granite and Marble
US$22,000.00-25,000.00
1 Piece(MOQ)



















