Powered by Made-in-China.com
Energy Saving Ball Mill of Mineral Processing Plant
US$16,000.00-700,000.00
1 set
Sample price:US$18000.00/set.Request sample
Product profile
Customization
AvailableType
Ball MillMotor Type
AC MotorModel NO.
MQ/MQYMotor Power
22kw/310kw/1000kw/2200kwRotationl Speed
39.2r/Min/22.4r/Min/17.8r/MinApplication
Mining and Mineral ProcessingMaterials
GoldCondition
NewFunction
Ore GrindingDrive Mode
Electric MotorVoltage
Multiple VoltagesPower
Multiple PowerTransport Package
ContainerizedSpecification
MQ/MQYTrademark
HZEOrigin
ChinaHS Code
8474202000Production Capacity
30 Sets/YearKey features
Energy Saving Design: Reduces energy consumption by 20-30% using large double row self-aligning rolling bearings.
Customizable Configuration: Motor voltage, liner materials, and discharge types can be selected based on customer demands.
Wide Application Scope: Suitable for mining, construction, silicate, and chemical industries for various metal and non-metal ores.
Modular Steel Frame: Steel frame design for mills under 2.7m diameter facilitates modular plant installation and reduces civil construction.
High Efficiency Grinding: Grooved ring high manganese steel liners increase contact surface, strengthen grinding, and lift ores effectively.
Reliable Operation: Features inching driving device for easy starting, perfect lubrication via air forced grease spaying atomizer.
Flexible Discharge Options: Slurry discharge type can be selected as overflow or grate according to mineral material situations.
Comprehensive Technical Support: Provides on-site installation, commissioning, staff training, and spare parts supply with expert team support.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤11.63hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
About Our Factory & Business Background
AddressTianhe Building, No. 163 Yingchun Street, Laishan District, Yantai
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsPlant of Mineral Processing, Jaw Crusher, Gold Recovery Equipment, Gold Elution Electrowinning Plant, Ball Mill, Hydrocyclone, Centrifugal Concentrator, Flotation Cell, Thickener, Gold Cyanide Leaching Plant
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the working principle of the ball mill?
A:
The transmission device drives the cylinder to rotate. Materials and water are fed from the feeding end and ground by the impact and grinding of steel balls into fine particles. The continuous grinding moves the slurry to the discharging end.
Q:What types of materials can this ball mill process?
A:
It is widely used for metal ores such as gold, silver, copper, lead, zinc, nickel, manganese, iron, molybdenum, chromium, tin, as well as non-metal ores like limestone, barite, quartz, graphite, feldspar, and fluorspar.
Q:Can the motor voltage and liner materials be customized?
A:
Yes, depending on site conditions, the electric motor can be selected as high-voltage or low-voltage type. Liner materials can be chosen as high manganese steel or wear-resistant rubber.
Q:What are the main advantages of this ball mill?
A:
It uses large double row self-aligning bearings to reduce friction and save 20-30% energy. Grooved high manganese steel liners increase grinding efficiency. It also features a large discharging outlet for higher capacity.
Q:What is the lead time for production?
A:
The average lead time is 3-6 months during peak season and 1-3 months during the off-season.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Efficiency Mining Mill Energy-Saving Ball Mill for Ore Processing
US$25,999.00-27,999.00
1 Set(MOQ)
(Original Factory Sale) Mineral Processing Plant Wet Grinding Mill/Clinker Mill GM Series Ball Mill for Grinding Ore/Gold/Copper
US$1,800.00-280,000.00
1 Set(MOQ)
Energy Saving Mineral Processing Ball Mill for Gold Ore
US$40,000.00-41,000.00
1 Piece(MOQ)
Energy Saving Type Mineral Processing Ball Mill
US$12,580.00-586,800.00
1 Set(MOQ)
Gold Mine Ball Mill of Mineral Processing Plant
US$6,500.00-200,000.00
1 set(MOQ)
Gold Ore Milling Circuit Facilities Wet Ball Mill of Mineral Processing Plant
US$6,500.00-200,000.00
1 set(MOQ)
Energy-Saving Mining Ball Mill with Large Output for Mineral Processing
US$6,600.00-6,900.00
1 Set(MOQ)
Gold Mining Ball Mill of Mineral Processing Plant
US$16,000.00-700,000.00
1 set(MOQ)
Energy Saving Ball Mill for Mineral Processing Mining Grinding
US$9,500.00-10,000.00
1 Set(MOQ)
Milling Machine Equipment Ball Mill of Mineral Processing Plant
US$6,500.00-200,000.00
1 set(MOQ)
Minerals Processing Plant Gold Mining Rock Crusher 900*1800 Grinding Equipment Machine Grinding Small Ball Mill
US$10,000.00-89,000.00
1 Set(MOQ)
Mineral Ore Grinding Energy Saving Wet / Dry Ball Mill/Gold Mining Machine with Competitive Ball Mill Prices
US$8,100.00-8,900.00
1 Set(MOQ)
High-Efficiency Energy-Saving Ball Mill for Mineral Powder Making
US$2,000.00-5,600.00
1 Set(MOQ)
Gold Ore Overflow Ball Mill of Mineral Processing Plant
US$16,000.00-700,000.00
1 set(MOQ)
Energy Saving Ball Mill for Gold Ore Grinding, Key Equipment in Mineral Processing Plant
US$28,250.00-29,250.00
1 Set(MOQ)
Small Size Gold Mining Ball Mill of Processing Plant
US$16,000.00-70,000.00
1 set(MOQ)
Gold Mining Grate Ball Mill of Mineral Processing Plant
US$6,500.00-200,000.00
1 set(MOQ)
Gzm2742 15~118 T/H Energy-Saving Mineral Processing Ball Mill
US$5,700.00-570,000.00
1 set(MOQ)



















