Powered by Made-in-China.com

Energy-Saving Overflow Ball Mill for Mineral Processing Plant
US$16,000.00-700,000.00
1 set
Sample price:US$20000.00/set.Request sample
Product profile
Customization
AvailableType
Ball MillMotor Type
AC MotorModel NO.
MQYsMotor Power
18.5kw/310kw/1000kw/2300kwRotationl Speed
39.2r/Min/22.4r/Min/17.8r/MinApplication
Mining and Mineral ProcessingMaterials
GoldCondition
NewFunction
Ore GrindingDrive Mode
Electric MotorVoltage
Multiple VoltagesPower
Multiple PowerTransport Package
ContainerizedSpecification
MQYsTrademark
HZEOrigin
ChinaHS Code
8474202000Production Capacity
10 Sets/YearKey features
Energy Saving Design: Reduces energy consumption by 20-30% using large double row self-aligning rolling bearings.
High Efficiency Grinding: Grooved ring high manganese steel liners increase contact surface and strengthen grinding.
Modular Plant Design: Steel frame supports modular design for mills up to 2.7 meters, reducing civil construction.
High Capacity Outlet: Large discharging outlet designed to increase processing capacity.
Customizable Motor Voltage: Electric motor selected as high-voltage or low-voltage type based on customer site conditions.
Customizable Liner Material: Liners available in high manganese steel or wear-resistant rubber based on demand.
Brand Selection Freedom: Customers can freely choose the brand of the motor or reducer.
Hydraulic Jack Option: Recommended hydraulic jacks for hybrid bearing mills to lift cylinder for easy installation.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤11.15hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What is the main business scope of your company?
A:
HZE provides mineral processing EPC, project consultation, engineering design, equipment manufacturing, installation, commissioning, training, operation management, spare parts supply, and technical support.
Q:What are the outstanding advantages of your company?
A:
We offer one-stop service as both an equipment manufacturer with a 50,000 square meter plant and an engineering company with its own R&D center and design institute.
Q:What are the characteristics of your company's 3D design?
A:
We use 3D software for equipment, process flow, pipelines, steel structures, packaging, and manuals to improve quality, shorten construction time, and reduce costs.
Q:What are the service features of your company?
A:
We provide close cooperation, detailed pre-sale planning, cloud-based customer files with documents and videos, and ongoing guidance and training for operators.
Q:What is the lead time for production?
A:
Peak season lead time is 3-6 months, while off-season lead time is 1-3 months.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Energy Saving Wet Type Grinding Ball Mill for Mineral Ore Processing
US$14,000.00
1 Piece(MOQ)
Mining Equipment Iron Ore Overflow Ball Mill of Processing Plant
US$16,000.00-700,000.00
1 set(MOQ)
Milling Circuit Facilities Overflow Ball Mill of Mineral Processing Plant
US$16,000.00-70,000.00
1 set(MOQ)
Copper Processing Plant Overflow Ball Grinder Mill for Mining
US$3,999.00-9,999.00
1 Set(MOQ)
Gold Ore Energy Saving Rod Mill of Mineral Processing Plant
US$16,000.00-600,000.00
1 set(MOQ)
Mine Grinding Plant Gold Ore Mill High Capacity Mineral Processing Ball Mill
US$3,999.00-9,999.00
1 Set(MOQ)
Energy-Saving Grate Ball Mill for Mineral Processing Plant
US$16,000.00-700,000.00
1 set(MOQ)
High-Efficiency and Energy-Saving Mineral Processing Ball Mill
US$3,000,000.00
1 Set(MOQ)
China Mill Mineral Processing Energy Saving Bar Mill Price for Sale
US$26,000.00
1 set(MOQ)
Energy Saving Mqy Overflow Ball Mill for Wet Process Cement and Raw Material Grinding
US$38,600.00-123,500.00
1 Piece(MOQ)
Energy Saving Mineral Ball Mill, Cone Ball Mill Machine for Stone Milling with 1-30 Tph
US$5,700.00-52,000.00
1 Piece(MOQ)
Ball Mill Gold Processing Plant High Capacity Energy Saving
US$9,500.00-10,000.00
1 Set(MOQ)
Energy Saving Mineral Processing Ball Mill for Gold Ore
US$40,000.00-41,000.00
1 Piece(MOQ)
Gzm2742 15~118 T/H Energy-Saving Mineral Processing Ball Mill
US$5,700.00-570,000.00
1 set(MOQ)
Wet Overflow Mineral Processing Ball Mill
US$6,900.00-7,300.00
1 Piece(MOQ)
Double Roller Wet Pan Mill for Gold Processing with Energy Saving
US$2,499.00-2,999.00
1 Piece(MOQ)
Energy Saving Big Ball Mill 2100 X 3600 in Mineral Powder Grinding Plant
US$54,220.00
1 Set(MOQ)



















