Powered by Made-in-China.com

Gold Ore Gravity Concentration Equipment with Processing Flowchart
US$30,000.00-500,000.00
1 set
Sample price:US$30000.00/set.Request sample
Product profile
Customization
AvailableCapacity
2-2000t/HApplication
Gold RecoverySupply Scope
PackageManufacture Period
2-6 MonthsInstallation
Indoor and OutdoorSupply Mode
One-Stop SolutionTransport Package
ContainerizedTrademark
HZEOrigin
ChinaProduction Capacity
5 Sets/YearKey features
One-Stop Solution: Comprehensive EPC services from design to commissioning and spare parts supply.
Customizable Capacity: Processing capacity ranges from 2 to 2000 tons per hour based on requirements.
3D Design Capability: Full 3D design for equipment, process flow, and facilities to reduce costs and improve safety.
Expert Technical Team: Team includes senior engineers, university professors, and top Chinese technical experts.
Cloud-Based Management: Customers access all project documents, videos, and data via secure cloud accounts.
Flexible Supply Scope: Offers equipment manufacturing, installation, training, and project operation management.
Short Construction Period: Gravity separation plants offer low capital and quick construction compared to other methods.
Versatile Application: Suitable for gold recovery from ores with granular gold, sticky slime, and clay.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤11.69hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What is the main business scope of your company?
A:
HZE provides mineral processing EPC, project consultation, engineering design, equipment manufacturing, installation, commissioning, staff training, project operation management, spare parts supply, and technical support.
Q:What are the outstanding advantages of your company?
A:
We offer one-stop service, own a 50,000 square meter production plant, have an in-house R&D center and design institute, and employ a team of senior engineers and university professors.
Q:What are the characteristics of your company's 3D design?
A:
We use 3D software to design equipment, process flow, pipelines, steel structures, and packaging. This improves quality, shortens construction time, and reduces project costs.
Q:What are the service features of your company?
A:
We provide detailed pre-sales planning, cloud-based document access for all customers, on-site and remote training, and continuous guidance on operation and maintenance.
Q:What is the lead time for production?
A:
The average lead time is 3-6 months during peak season and 1-3 months during the off-season.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Gold Ore Gravity Separation Equipment with Processing Flowchart
US$30,000.00-500,000.00
1 set(MOQ)
Gold Ore Gravity Beneficiation Equipment with Processing Flowchart
US$30,000.00-500,000.00
1 set(MOQ)
Gold Mineral Processing Plant Mining Equipments From Gandong
US$19,000.00-20,000.00
1 Piece(MOQ)
Gold Ore Medium Scale Mineral Processing Equipment with Flotation Flowchart
US$30,000.00-1,000,000.00
1 set(MOQ)
Portable Small Scale Free Gold Gravity Concentration Processing Equipment
US$8,000.00-30,000.00
1 set(MOQ)
Rock Gold Mineral Processing Plant Mining Equipments From Gandong/Jiangxi Well-Tech International Mining Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Premium Underground Gold Mining Equipment with Rotary Kiln
US$126.00
1 Piece(MOQ)
Small Scale Gold Mining Equipment for Rock Stone Gold Plant
US$19,000.00-20,000.00
1 Piece(MOQ)
Wanrun Hot Sale Portable Gold Mining Equipment with Trommel for River and Stream Operations
US$4,509.59
1 Piece(MOQ)
Gold Mining Equipment for Sale
US$50,000.00
1 set(MOQ)
Gold Finding Equipment Black Sand Shaking Tables for Gold Processing Plant High Recovery
US$1,200.00-1,260.00
1 Piece(MOQ)
Advanced Ore Processing Equipment Price
US$6,000.00-90,000.00
1 Piece(MOQ)
Stone Gold Plant Complete Set Machine Include Water Pump Slurry Pump All Auxiliary Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
5-50tph Gold Mining Equipment Manufacturer
US$50,000.00
1 set(MOQ)
Water Well Drilling Equipment with Truck Mounted Air Compressor
US$35,666.00
1 Piece(MOQ)
Environmental Friendly Electrolysis Equipment for Copper Processing
US$30,000.00-50,000.00
1 Piece(MOQ)
DALI UK-30 Dump Truck Underground Gold Mining Equipment Price
US$580,000.00
1 Piece(MOQ)
Magnetite Iron Ore Beneficiation Equipment
US$20,000.00-500,000.00
1 Set(MOQ)



















