Powered by Made-in-China.com

Gold Ore Medium Scale Mineral Processing Machine Cyanidation CIL Plant with Flowchart
US$100,000.00-2,000,000.00
1 set
Sample price:US$120000.00/set.Request sample
Product profile
Customization
AvailableCapacity
2-2000t/HApplication
Gold RecoverySupply Scope
PackageManufacture Period
3-8 MonthsInstallation
Indoor and OutdoorSupply Mode
One-Stop SolutionTransport Package
ContainerizedTrademark
HZEOrigin
ChinaProduction Capacity
5 Sets/YearKey features
High Gold Purity: Gold ingot purity reaches over 97% after smelting and purification.
Efficient Elution System: Advanced elution-electrowinning system completes each cycle in just 10 hours.
One-Stop Solution: Provides complete solutions including design, manufacturing, logistics, and training.
Eco-Friendly Process: Recycles filtrate and reuses chemicals to protect the environment and reduce consumption.
Advanced 3D Design: Uses 3D software for equipment, process flow, and packaging to improve quality and safety.
Expert Technical Team: Backed by R&D center, design institute, and top technical experts and professors.
Cloud Service Management: Customers access project documents, videos, and data via cloud accounts for transparency.
Flexible Capacity: Processing capacity ranges from 2 to 2000 tons per hour to suit various scales.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤11.02hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What is the purity of the final gold ingot?
A:
The purity of the merged gold ingot can reach over 97%. Further processing is required if higher purification is needed.
Q:How long does one cycle of the elution-electrowinning system take?
A:
Each cycle of operation of the advanced elution-electrowinning system takes only 10 hours to complete.
Q:What services are included in the one-stop solution?
A:
The solution includes engineering design, equipment manufacturing and supply, logistics, installation, commissioning, training, trial production, and technical support.
Q:How does the company ensure environmental protection?
A:
Tailings are dewatered for filtrate recycling, residual cyanide is reused to reduce consumption, and hazardous chemicals are prevented from being discharged outside the plant.
Q:What is the typical manufacturing period for the plant?
A:
The manufacture period is typically 3-8 months, with peak season lead times of 3-6 months and off-season lead times of 1-3 months.
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Energy Saving Gold Concentrator Machine Mineral Ore Processing Plant
US$2,000.00-20,000.00
1 Set(MOQ)
Full 5t Per Hour Small Scale Mobile CIP Gold Processing Machine Plant
US$5,500.00-15,500.00
1 Set(MOQ)
CIP Cil Gold Ore Processing Plant Suppliers in China
US$2,000.00-20,000.00
1 Set(MOQ)
EPC Gold Equipment for CIL CIP Plant with Processing Engineering Design
US$70,000.00-500,000.00
1 set(MOQ)
Cil, CIP Processing Gold Ore Beneficiation Plant Flotation Separation Plant
US$2,000.00-20,000.00
1 Set(MOQ)
100 Tph Mobile Alluvial Mineral Gold Placer Gold Mining Processing Washing Plant
US$1,000.00-10,000.00
1 Piece(MOQ)
Gold Ore Medium Scale Mineral Processing Cyanidation CIL Plant
US$100,000.00-2,000,000.00
1 set(MOQ)
Lane Dubai Mining Small Scale Gold Mining Equipment Mobile Gold Wash Plant Trommel Gold Processing Plant
US$35,000.00-75,000.00
1 Piece(MOQ)
5thp Small Scale Rock Gold Processing Plant in Zimbabwe Complete Gold Line Machine
US$19,000.00-20,000.00
1 Piece(MOQ)
Lane Gold Concentrator Trade Small Scale CIP Gold Processing Plant Mobile Trommel Gold Washing Plant
US$20,000.00-79,000.00
1 Piece(MOQ)
Gold Ore Medium Scale Mineral Processing Plant with Flotation Flowchart
US$30,000.00-1,000,000.00
1 set(MOQ)
Small Mining Scale Rock Gold Gravity Extracted Equipment Rock Gold Prcessing Plant
US$12,000.00
1 Piece(MOQ)
Gold Ore Small Scale Mineral Processing Cyanidation CIL Plant with Flowchart
US$100,000.00-2,000,000.00
1 set(MOQ)
50 Tpd River Gold Washing Plant with Trommel and Shaker Table
US$950.00-100,000.00
1 Piece(MOQ)
Gold Diamond Chrome Tin Ilmenite Tantalum Heavy Sand Ore Processing Plant
US$19,000.00-20,000.00
1 Piece(MOQ)
Rock Gold Ore Extraction Plant with Cyanide Leaching Process
US$50,000.00
1 set(MOQ)
Small Scale Rotary Kiln Making Quick Active Lime Processing Plant
US$200,000.00-1,000,000.00
1 Set(MOQ)
PLC Lime Processing Plant with Vertical Preheater
US$200,000.00-1,000,000.00
1 Set(MOQ)
Sulfur Gold Ore Flotation Processing Plant
US$50,000.00
1 set(MOQ)



















