Powered by Made-in-China.com

Turnkey Project Gold Equipment for CIL Plant with Processing Engineering Design
US$70,000.00-500,000.00
1 set
Sample price:US$150000.00/set.Request sample
Product profile
Customization
AvailableType
Gold Modular PlantFunction
Gold RecoveryDrive Mode
Electric MotorVoltage
Multiple VoltagesPower
Multiple PowerApplication
Small Scale Gold MinesTransport Package
ContainerizedSpecification
VariousTrademark
HZEOrigin
ChinaProduction Capacity
5 Sets/YearKey features
Modular CIP/CIL Plant: Recovers free gold from sulfide, oxidized, alluvial ores, and tailings with customizable modules.
Customizable Configuration: Free selection of modules like crushing, grinding, gravity concentration, and leaching based on requirements.
High Recovery Rate: Achieves 85-95% comprehensive gold recovery across all models with optimized process flow.
Energy Saving Design: Unique air supply device improves oxygen utilization, reduces air supply, and lowers agitator power input.
Environmental Protection: Tailings dewatering module reduces water and cyanide consumption, allowing maximum reuse of reagents.
Integrated HZTank Technology: Proprietary HZTank with six independent chambers ensures continuous processing and easy management.
Flexible Power Supply: Suitable for areas with inconvenient traffic or power shortages, using diesel generators or grid power.
One-Stop EPC Service: Provides complete services from engineering design, manufacturing, installation to commissioning and training.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2014-08-01Nearest Port: QINGDAOAverage Response Time: ≤10.31hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
AI-Powered supplier vetting
SummaryYantai Huize Mining Engineering Co., Ltd. (HZE) is identified as a China-based manufacturer/factory and limited company specializing in mineral-processing and mining equipment. The supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 certifications, 21–30 quality-control staff, more than 10 production lines, and 41–50 years of total R&D-engineer experience. Reported production includes 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. The company states it has self-operated import/export rights and that exports represent 51%–70% of sales. Evidence is insufficient to verify after-sales service, customization capability, or broad customer-case experience. Trade records show one transaction each associated with Tanzania and RAMANI INVESTMENT LIMITED for sleeves and springs, but these records do not establish performance or project success.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company headquartered in Yantai, Shandong, China. Its stated offerings cover a broad range of mineral-processing equipment, although one associated-company classification identifies a trading-company nature, creating some classification inconsistency.
CertificationsThe supplier reports ISO 9000, ISO 9001, ISO 14000, and ISO 14001 management-system certifications. These stated certifications support the presence of formal quality and environmental management systems.
R&D capabilityThe supplier reports 41–50 years of total R&D-engineer experience and describes a company philosophy focused on detail and quality improvement. This supports an established technical development function, but no specific patents, proprietary technologies, or documented innovations are provided.
Production capacityThe supplier reports more than 10 production lines, 21–30 quality-control staff, and substantial output figures: 58 complete mineral-processing plants, 162 ball mills, 360 flotation machines, 188 jaw crushers, and 196 gold-leaching tanks. These figures explicitly support significant production capacity.
Product Q&A
Q:What types of ores can this plant process?
A:
The modular CIP/CIL plant recovers free gold from sulfide ores, oxidized ores, alluvial ores, and tailings.
Q:Can I customize the plant configuration?
A:
Yes, customers can freely select modules such as comminution, grinding, gravity concentration, thickening, leaching, and elution to form a complete plant based on raw material and customer requirements.
Q:What is the gold recovery rate?
A:
The comprehensive gold recovery rate is 85-95% for all models (HZCIL-1, HZCIL-2, HZCIL-3).
Q:How long does on-site installation take?
A:
The on-site installation period is 7 days for models HZCIL-1 and HZCIL-2, and 10 days for model HZCIL-3.
Q:What is the capacity of the plant?
A:
The capacity ranges from 1 MT/h (HZCIL-1) to 2 MT/h (HZCIL-2) and 3 MT/h (HZCIL-3).
Send Inquiry
*To:
Yantai Huize Mining Engineering Co., Ltd.
Yantai Huize Mining Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Professional Mining Equipment Gold Processing Equipment for CIL Gold Plant
US$3,000.00-100,000.00
1 set(MOQ)
Small Scale Portable Modular Gold Mining Processing Equipment for Artisanal Miner
US$8,000.00-400,000.00
1 set(MOQ)
Small Scale Gold Mining Equipment for Rock Stone Gold Plant
US$19,000.00-20,000.00
1 Piece(MOQ)
Gold Ore Small Scale Mineral Processing Equipment with Flotation Flowchart
US$30,000.00-1,000,000.00
1 set(MOQ)
Alluvial / Placer / Hard Rock Ore Gold Mining Equipment for Processing
US$3,000.00-5,000,000.00
1 Piece(MOQ)
Gold Mineral Processing Plant Mining Equipments From Gandong
US$19,000.00-20,000.00
1 Piece(MOQ)
Rock Gold Mineral Processing Plant Mining Equipments From Gandong/Jiangxi Well-Tech International Mining Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Mining Equipment for Gold, Copper, Lead&Zinc, Alluvial Gold, etc
US$12,300.00
1 Set(MOQ)
Stone Gold Plant Complete Set Machine Include Water Pump Slurry Pump All Auxiliary Equipment
US$19,000.00-20,000.00
1 Piece(MOQ)
Electrolysis Equipment for Anode Copper Processing Refining
US$30,000.00-50,000.00
1 Piece(MOQ)
Environmental Friendly Electrolysis Equipment for Copper Processing
US$30,000.00-50,000.00
1 Piece(MOQ)
Gold Mining Equipment for Rubber Belt Vacuum Filter
Negotiable
1 Piece(MOQ)
Gold Finding Equipment Black Sand Shaking Tables for Gold Processing Plant High Recovery
US$1,200.00-1,260.00
1 Piece(MOQ)
Electrolysis Equipment for Scrap Copper Recycling Processing
US$30,000.00-50,000.00
1 Piece(MOQ)
Heavy Duty Placer Alluvial Gold Washing Plant Machine Gold Mining Equipment for Philippines Site
US$15,000.00
1 Piece(MOQ)
High Recovery Electrolysis Equipment for Copper Recycling
US$30,000.00-50,000.00
1 Piece(MOQ)
Wanrun Hot Sale Portable Gold Mining Equipment with Trommel for River and Stream Operations
US$4,509.59
1 Piece(MOQ)
Thickening Equipment for Gold Mining From China Factory
US$15,000.00-420,000.00
1 Set(MOQ)
Customized Gold Mining Equipment Alluvial Sand Gold Washing System for High Clay Deposits
US$15,000.00
1 Piece(MOQ)
Hot Sale New Type Ceramic Kiln Plant Designed Production Line Mining Equipment
US$20,000.00
1 Piece(MOQ)



















