SourcingAI
Try for free
Powered by Made-in-China.com
Built-in Adapter Pin Jack for Electric Vehicle Charging Cable
US$0.50
5,000 Pieces
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

Application

Power, Automobile, RF, Audio & Video, PCB, Microwave, FPC

Transport Package

Carton Box or Wooden Box

Model NO.

CNC028

Trademark

INT

Origin

China

Production Capacity

50000000

Key features

ISO9001 Certified Factory: Manufacturing facility has attained ISO9001 certification for quality assurance.
OEM/ODM Service: Supports OEM and ODM projects based on customer drawings or technical documents.
Wide Material Selection: Processes Copper, Aluminum, Brass, Stainless Steel, and Steel.
Multiple Surface Treatments: Offers galvanizing, anodizing, powder coating, polishing, and more.
Fast Sample Delivery: Trial samples can be produced within 3-5 days after confirmation.
Comprehensive Testing: Uses CMM, hardness testers, and provides ROHS/SGS inspection reports.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2012-10-16Nearest Port: Shenzhen, Guangzhou, HongkongAverage Response Time: ≤4.42hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, CPT, Others, FCA

About Our Factory & Business Background

AddressNo2, Shangtun Liyuan Road, Liaobu Town, Dongguan, Guangdong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsElectrical Contacts, Rivets, Copper Strip, Clad Metal Strip, Metal Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Do you have an ISO certificate?
A:
Yes, we have obtained ISO9001.
Q:How long is the delivery time for CNC metal parts?
A:
1) For samples, the time is about 3-5 days. 2) For large orders, the time is about 15-25 days or negotiation time. 3) If it is an OEM product, it needs to make a mold, the delivery time is about 25-35 days, and the specific delivery time needs to be communicated. The time you receive the goods is subject to the specific logistics and transportation.
Q:Do you manufacture parts according to our design?
A:
Yes, we always do it according to the customer's drawings or technical documents.
Q:How do you control the quality?
A:
We strictly follow the customer's drawings and requirements for production, each process has a strict control plan, complete inspection of each part, and strive to provide customers with 100% high-quality products, and provide ROHS/SGS inspection reports and material certification.
Q:Do you provide samples? Free or charge?
A:
Yes, if there are samples in stock, it is free, if not, some manufacturing costs need to be charged. But the freight needs to be provided by our valued customers.

Send Inquiry

*To:DONGGUAN INT METAL TECH CO., LTDDONGGUAN INT METAL TECH CO., LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Mini DIN Connector Combo RCA Jacks (MDC-RCA-410)
Made-in-China.com
DC Power Jack Connector DC Power Jack Socket
Made-in-China.com
Phone Jack

Phone Jack

US$0.01
1,000 Pieces(MOQ)
Made-in-China.com
Phone Jack

Phone Jack

US$0.01
1,000 Pieces(MOQ)
Made-in-China.com
RJ45 Connectors with Magnetics and LED Light
Made-in-China.com