SourcingAI
Try for free
Powered by Made-in-China.com
Warehouse Heavy Duty Selective Pallet Racking and Shelving System
US$750.00-850.00
1 Ton

Product profile

Customization

Available

Warranty

5-Years

Usage

Tool Rack, Supermarket, Industrial, Warehouse Rack, Racking

Model NO.

IRACKING

Material

Steel

Structure

Rack

Type

Pallet Racking

Mobility

Adjustable

Height

up to 12m

Weight

up to 4, 000 Kgs Udl/Level

Closed

Open

Development

Conventional

Serviceability

Common Use

Racking Dimension

Custom-Made to Specific Storage Needs

Finish

Powder Coated

Installation

Easy

Accessories

Bolt, Protectors etc.

Application

Normal Condition, Warehouse

Operation Tool

Forklift

Transport Package

Bundle + Plastic Film + Carton

Specification

ISO 9001: 2008, CE, as-4084

Trademark

IRACKING

Origin

Nanjing, China

HS Code

73089000

Production Capacity

6, 000 Tons/Month

Key features

Customizable Dimensions: Height, depth, and beam length can be tailored to specific storage needs.
High Load Capacity: Supports up to 4,000 kg UDL per level with adjustable configurations.
Premium Steel Material: Constructed from Q235 steel sourced from top-tier Jiangsu Shagang Group.
ISO and CE Certified: Meets international standards including ISO9001:2008, SGS, CE, and AS 4084.
Powder Coated Finish: Available in powder coated or pre-galvanized options for durability.
Rapid Design Service: Free drawings and quotes provided within 48 hours based on warehouse specs.
Contract Tracking System: Real-time updates and photos available for every production stage.
Flexible Installation: Infinitely adjustable shelves with easy installation and floor storage options.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2009-12-01Nearest Port: NanjingAverage Response Time: ≤8.57hTerms of Payment: LC, T/T

About Our Factory & Business Background

Address125, Ninghai Road, Nanjing, Jiangsu, China
Plant Area1300 square meters
Number of Employees28
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsStorage Equipments, Warehouse Shelving and Racking, etc.
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2013-10-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Our Certifications, Standards & Industry Recognition

Product CertificationCE, Others

Product Q&A

Q:Where is your factory located? How can I visit there?
A:
Our factory is located in Nanjing City, Jiangsu Province, China, close to Shanghai. You can fly to Nanjing or Shanghai airport directly. You are warmly welcome to visit us whenever you are available!
Q:What is the raw material of your products?
A:
As general, the raw material of steel code is Q235. Other steel is also available to clients' requirements.
Q:What is the term of payment?
A:
As general, 30% T/T down payment and balance before shipping.
Q:What is delivery time?
A:
It depends on the order quantity and racking types. As general, within 15 days, for ordinary order quantity of Storage Pallet Racking System.
Q:Which port will be used as loading port?
A:
Nanjing port, the closest port to us, is recommended strongly as loading port. Shanghai port is also available, but not recommended because of much higher in-land trucking transportation costs from our factory.

Send Inquiry

*To:Nanjing IRACKING Co., Ltd.Nanjing IRACKING Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy Duty Automated Storage and Retrieval System
Made-in-China.com
Heavy Duty Rack Supported Warehouse Mezzanine System
Made-in-China.com