SourcingAI
Try for free
Powered by Made-in-China.com
Ductile Iron Casting Stressing Anchorage for Post Tensioning System
US$4.52
100 Pieces

Product profile

Customization

Available

After-sales Service

12 Months

Warranty

12 Months

Model NO.

SP9742

Application

Bridge, Railway, Highway, Building, Tunnel, Slope

Certification

CCC, CE, ISO

Surface Treatment

Sandblasting

Technics

Iron Sand Casting

Material

Ductile Iron, Grey Iron

Type

Slab Anchorage

Item Name

Arc Slab Anchor

Diameter

12.7mm, 15.2mm

Sample

Available

Hole Type

3s, 5s

Capacity

16t

Hardness

50-100HRC

Wedge Type

2 PCS or 3 PCS

Inspection

100% Before Shipment

Standard

BS,GB,ISO,JIS,CE,Ks, BS,GB,ISO,JIS,CE,Ks

Transport Package

Wooden Case

Specification

Customized

Trademark

SP

Origin

China

HS Code

8486909000

Production Capacity

80, 000 PCS Monthly

Key features

Ductile Iron Material: Constructed from spheroidal graphite cast iron for superior strength and durability.
Wide Application Scope: Suitable for bridges, railways, highways, buildings, tunnels, and slope stabilization.
Full Strand Sealing: Design allows full length of PC strand to be fully sealed for maximum protection.
Compact Structure: Integrated anchor head and bearing plate design ensures reliable anchoring.
High Performance Standard: Meets GB/T14370-2000 national requirements and supports up to 2000MPa PC strand.
OEM Customization: Parts made strictly according to customer drawings with confidential design protection.
12 Months Warranty: Comes with a 12-month warranty and after-sales service coverage.
Multi-Certification: Certified by CCC, CE, ISO, BS, GB, JIS, and KS standards.

Company profile

Business Type: Manufacturer/FactoryExport Year: 1990-02-01Nearest Port: Ningbo, Shanghai, TianjinAverage Response Time: ≤24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF

About Our Factory & Business Background

AddressYuan Feng Road, Dongjiao Industrial Area Fenghua, Ningbo China, 315500, Ningbo, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsIron Sand Casting Part, Ductile Iron Casting Part, Gray Iron Casting Part, Stainless Steel Casting Part, Precision Investment Casting Part, Carbon Steel Casting Part, Lost Wax Casting Part, Grey Iron Casting Part

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are used for the anchor head and wedges?
A:
The anchor head is made of spheroidal graphite cast iron, and the wedges are made of 20CrMnTi.
Q:What are the available diameter options?
A:
Available diameters include 12.7mm and 15.2mm for steel strands.
Q:Can this product be customized?
A:
Yes, all parts are made according to customer drawings and requirements, and designs are kept confidential.
Q:What is the warranty period?
A:
We provide a 12-month warranty and after-sales service.
Q:What are the lead times for production?
A:
The average lead time is one month for both peak and off-peak seasons.

Send Inquiry

*To:Ningbo Supreme Machinery Co., Ltd.Ningbo Supreme Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like