SourcingAI
Try for free
Powered by Made-in-China.com
New Liugong Wheel Loader for Foundation Pit Backfill, Strong Push Power Moves Large Soil Volume Quickly, Keeps Construction Schedule on Track
US$30,000.00-60,000.00
1 Piece

Product specifications

Model

Product profile

After-sales Service

Support

Warranty

1 Year

Certification

ISO

Model NO.

CLG866H

Condition

Used

Rated Load

3-6t

Transmission

Hydraulic - Mechanical

Load and Unload Mode

Front Discharge

Walking Mode

Wheeled

Type

Large Loader

Product Name

Wheel Loader

Keywords

Loader

OEM Custom

Yes

ODM Custom

Yes

Package

Film Paper

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Trademark

Iron Giant

Origin

Hunan, Chinia

Key features

Versatile Application Scenarios: Suitable for mining, road construction, port logistics, and infrastructure projects.
Durable Heavy-Duty Structure: Robust reinforced chassis and high-strength alloy steel frame for extreme environments.
Efficient Operation System: High-performance engine and advanced hydraulic system ensure fast response and stability.
Optimized Bucket Design: Large-capacity bucket with excellent digging depth and dumping height for various materials.
Superior Maneuverability: Compact turning radius and precise steering for confined sites and urban areas.
Easy Maintenance Design: Quick-access inspection points reduce downtime and lower operating costs.
ISO Certified Quality: Product meets ISO certification standards for reliability and safety.

Company profile

CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Minor Customization CertifiedExport Year: 3 Years CertifiedNearest Port: Tianjin Port, Shanghai Port, Qingdao PortAverage Response Time: ≤9.72h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

Address5th Floor, Building 17, Mingcheng Green Valley, Changsha County, Changsha, Hunan, China
Plant Area303 square meters
Number of Employees16
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsConcrete mixer truck, Concrete pump truck, Wheel loader, Rotary drilling rig
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2023-08-24
Main MarketsNorth America, South America
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff8
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a factory or a trader?
A:
We are a manufacturer integrating industry and trade. Welcome to visit our company.
Q:What payment methods do you support?
A:
We support T/T, Western Union, PayPal, cash, etc. The details can be negotiated.
Q:What are your modes of transportation?
A:
We usually choose the appropriate mode of transportation (sea, air, land) according to the conditions of the goods, or we can choose the mode of transportation according to your requirements.
Q:How can I get an accurate quotation?
A:
You can first send your specific demand information and product pictures, and we will customize a solution for you according to your needs and inform you of the specific price.
Q:What is the warranty period?
A:
The warranty period is 1 year.

Send Inquiry

*To:Hunan Iron Giant Technology Co., Ltd.Hunan Iron Giant Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

New 5.5 Ton Wheel Loader Liugong 856h for Mining and Quarry
Made-in-China.com