SourcingAI
Try for free
Powered by Made-in-China.com
Hydraulic Mobile DTH Drilling Rig Equipped with Screw Air Compressor for Blast Hole
US$10,999.00
1 sets
US$8,888.00
2+ sets

Product profile

Customization

Available

After-sales Service

Provided

Warranty

1 Year

Model NO.

KG510

Certification

CE, ISO 9001:2000

Condition

New

Motor

24V

Drill Hole Diameter

105-152mm

Drill Hole Depth

<100m

Bit Type

DTH

Drilling Way

Rotary

Diameter of Hole

105 152mm

Feed Distance

3000mm

Rotation Speed

0-100r Min

Walk Speed

0-3.5km H

Depth of Economical Drilling

25m

Rotation Torque

3000n M

Voltage

24V

Drilling Depth

Max.25m

Feed Way

Oil Cylinder Chain

Use

Bore Pile Drilling Machine

Weight

6500 Kg

Lift Power

40000n

Applicable Industries

Energy & Mining, Drilling

Core Components

Motor, Other, Gear, Bearing, Engine

Drilling Diameter

105 152mm

Specification

6800X2200X2850mm

Trademark

JCDRILL

Origin

Beijing, China

Key features

Compliance with Emission Standards: Equipped with Yuchai four-cylinder engine meeting China 3 national emission standards.
High Power and Climbing Capacity: Features four-wheel drive, folding frame track, and plunger piston tramming motor.
Enhanced Drilling Performance: Double rotation motor increases rotary torque and speed; expanded lifting oil cylinder.
Superior Dust Collection: Enlarged dust collector provides better effect on dust collection for cleaner operation.
Robust Structural Design: Thickened profile folder for housing improves intensity and rigidity; additional ring for easy handling.
Versatile Drilling Capabilities: Drill hole diameter 105-152mm, depth <100m, suitable for blast hole and bore pile drilling.
Flexible Customization Options: Supports full customization, minor customization, and customization from samples or designs.
Comprehensive Warranty Coverage: Provides 1-year warranty with professional after-sales service and spare parts support.

Company profile

Beijing Jincheng Mining Technology Co., Ltd.
Years of Export ExperienceProduct CertificationHigh Repeat Buyers Choice
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 11years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.16h

About Our Factory & Business Background

AddressRm1604, Mansion 2, No. A13 Beiyuan Road, Chaoyang District, Beijing, China
Terms of PaymentLC, T/T, PayPal, D/P, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1set
Supply Chain Partners60

Our Production Capability & Technical Expertise

Main ProductsCore Drilling Rig, Water Well Drilling Rig, Rock Drilling Rig, Engineering Drilling Rig, DTH Drilling Tools, Diamond Core Drilling Tools, Water Well Drilling Tools, Portable Air Compressor, Drill Mud Pump
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers2 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsAfrica
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you the original manufacturer?
A:
Yes, we JCDRILL is an official leading manufacturer in drilling machinery in China and we have the whole series products you need.
Q:Which payment terms are available to us?
A:
T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without 'soft clauses' can be accepted.
Q:Which Incoterms 2010 terms can we work?
A:
We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
Q:How long will the delivery time take?
A:
Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
Q:Spare Parts When You Need Them
A:
We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

Send Inquiry

*To:Beijing Jincheng Mining Technology Co., Ltd.Beijing Jincheng Mining Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

DTH Drilling Rig Integrated Mine Crawler with Screw Compressor
Made-in-China.com
Hydraulic Mobile Diamond DTH Hammer Core Drilling Rig
Made-in-China.com