SourcingAI
Try for free
Powered by Made-in-China.com
C7 Precision Rolled Thread 16mm 10mm Long Lead 3000mm Ball Screw for CNC Machine
US$18.00-195.00
1 Set
Sample price:US$18.00/set.Request sample

Product profile

Customization

Available

Flange

with Flange and Without Flange

Nut Number

Single and Double

Model NO.

SFU/SFNU

Nut Type

Circulator and End Cap

Precision

C7,C5,C3

Rows Number

3 Row and 4 Row

Screw Diameter

4mm-120mm

Type

Inner Loop and End Cap Loop

Ball Screw Nut Type

Sfu, Dfu, Sfs, Sfy, Sfe, Sfk, Sfi, Sfa, Sfh, Bsh

Manufacturing Process

Rolled or Ground Ball Screw

Ball Screw Max Length

9000mm

End Process

Custmized(Thread, Keyway, Wrench Position)

Ball Nut Customized

Support

Ball Screw Material

S55c High Carbon Steel/45# Steel

Ball Screw Hardness

59-63 HRC

Ball Screw Nut Material

20crmo Bearing Steel or 45# Steel

Preload

P0, P1, P2, P3

ODM and OEM

Yes, We Support

Matching Product

Ball Nut Housing, Ball Screw Support, Coupling

Circulation Method

Internal, External, End Cap

Transport Package

Sea, Land and Air Transport/Carton or Customized

Specification

Size is TBI size, can instead of TBI using

Trademark

JLD

Origin

Lishui, Zhejiang, China

HS Code

8483401090

Production Capacity

100000 Pieces Per Year

Key features

Customizable Specifications: Supports customization for nut type, length up to 9000mm, and end processing per customer drawings.
High Precision Options: Available in C3, C5, and C7 precision grades with hardness up to 63 HRC for accurate motion control.
OEM & ODM Service: Professional manufacturer offering full OEM/ODM support with competitive factory pricing.
Wide Application Range: Suitable for CNC machines, medical equipment, printing, and textile machinery across global markets.
Fast Delivery & Support: Stock items ship in 1-3 days; 24/7 technical support and 1-year warranty provided.
Quality Assurance: ISO9001 certified with professional QC team ensuring high quality and stable performance.

Company profile

Lishui City Jialida Bearing Co., Ltd.
High Repeat Buyers ChoiceQA/QC InspectorsManagement CertificationProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 2010-03-30Nearest Port: Ningbo port, Shanghai port, Qingdao portAverage Response Time: ≤1.32h

AI-Powered supplier vetting

SummaryThe supplier is a combined production and sales company specializing in linear optical axes and linear bearings, with permitted import and export operations. It has ISO9001:2015 and RoHS certifications, documented finished-product inspection instructions, in-stock capability, and reported peak-season order fulfillment within 15 workdays. Export operations have continued for 15 years, with exports representing 51%–70% of total sales, and the supplier holds self-operated import/export rights. Customization and ODM services are available, including sample-, design-, flexible, minor, and full customization. However, the supplier reports no written procedures or records for corrective/preventive actions or complaint handling, no valid manufacturing-capacity contract with an affiliated subcontractor, no overseas warehouses, showrooms, agents, branches, or offline trade-show participation, and no new products in the past year. Financial information is limited to references to financial records for 2022–2024,...
Supplier typeThe supplier is identified as a combined company engaged in production and sales of linear optical axes and linear bearings, with a business scope that also includes automation technology consulting and permitted import/export activities. This indicates a manufacturer-trader structure with a defined industrial product focus.
CertificationsThe supplier reports an ISO9001:2015 management-system certificate and RoHS certification for sustainable development/product compliance. These explicitly documented certifications support quality-management and regulatory-compliance capability.
After-Sales capabilityThe supplier has some approved-supplier service information and in-stock service capability, but it has no written corrective/preventive-action procedures or records and no written complaint-handling procedures or records. It also lacks overseas warehouses, showrooms, agents, and branches, limiting demonstrated after-sales infrastructure.
R&D capabilityThe supplier offers ODM services and broad design customization, but reports no new products in the past year, no available SDK, and no ERP, OA, CRM, or SAP-based digital management systems. These findings show some design-service capability but do not demonstrate strong recent product innovation or digital R&D infrastructure.
Production capacityThe supplier has in-stock capability, documented and uniformly followed finished-product inspection instructions, and reports peak-season order fulfillment within 15 workdays. However, it has no valid contract covering manufacturing capacity between the factory and an affiliated subcontractor, creating a stated weakness in manufacturing-capacity governance.
Customization capabilityThe supplier explicitly provides customization from samples, customization from designs, flexible customization, minor customization, and full customization, and also offers ODM services. This is direct evidence of broad customization coverage.

Product Q&A

Q:Are you a factory or trading company?
A:
We are a factory offering the most competitive prices and high-quality products.
Q:Do you offer OEM and ODM services?
A:
Yes, we support OEM and ODM services. Please send us the drawings and pictures for the required type.
Q:Can I get samples or discounts?
A:
Yes, please contact us directly. We are honored to offer samples for your quality check.
Q:What is the delivery time?
A:
For stock products, delivery is 1-3 days. For other quantities, it takes 3-30 days based on negotiation.
Q:What is the warranty period?
A:
We offer a one-year warranty and lifelong service provided the product is used properly.

Send Inquiry

*To:Lishui City Jialida Bearing Co., Ltd.Lishui City Jialida Bearing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like