Powered by Made-in-China.com
Galvanized Steel Cuplock Kwikstage Shoring Pipe Frame System Scaffolding
US$870.00
1-4 Tons
US$700.00
5-9 Tons
US$500.00
10+ Tons
Product profile
Customization
AvailableAfter-sales Service
One YearWarranty
One YearModel NO.
Q195 Q235 Q345Material
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Single Row ScaffoldingErection Position
Internal ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldSurface Treatment
Black, Hot DIP Galvanized, Powder CoatedColor
as RequestKeywords
Cuplock Scaffolding LedgerTransport Package
PalletSpecification
length 0.5m-3mTrademark
RenzhongOrigin
ChinaKey features
The cuplock scaffolding is efficient in assembly and disassembly, offers high load capacity, ensures stability and safety, and enables convenient construction.
The cuplock scaffold components are prone to damage and loss; strict control over component specifications, proper assembly, and reinforcement is essential.
The cuplock scaffolding has a large bearing capacity and high rigidity. It can be erected quickly and has strong overall stability.
Suspended scaffolding for road, bridge, building and civil engineering construction, aiming to enhance efficiency, reduce costs and ensure work safety
Compared with traditional scaffolding, cuplock scaffolding is faster to assemble and disassemble, and has better overall rigidity and safety.
The cuplock scaffolding joints are self-locking and stable, facilitating quick assembly and disassembly, and have strong versatility and high safety and reliability.
Company profile

Business Type: Trading CompanyExport Year: 2019-08-30Nearest Port: Shanghai Port, Tianjin PortAverage Response Time: ≤5.32hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA
About Our Factory & Business Background
AddressWuxi, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsStainless Steel Tube, Stainless Steel Sheet, Scaffolding, Stainless Steel Coil, Scaffolding Pipe, Stainless Steel Pipe, Stainless Steel Plate, Scaffolding Coupler, 304 Stainless Steel Sheet, 304 Stainless Steel Plate
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:How can we trust your company?
A:
We specialize in steel business for many years,you are welcome to investigate in any way,anyway,you can place an order on Made-in-China,with trade assurance,which can ensure your payment.
Q:How do you guarantee the quality?
A:
1.We have passed ISO9001,SGS,CE and other certifications;
2.Always have pre-production samples before mass production,and always do finalinspection before shipment;
3. Acceptable third-party inspection.
Q:About the product price?
A:
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q:Can I visit your factory?
A:
Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q:Can you send samples?
A:
Of course,we can send samples to all over the world,our samples are free,but customers need to bear the express cost.
Send Inquiry
*To:
Jiangsu Renzhong Metal Products Co., Ltd.
Jiangsu Renzhong Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Shoring Galvanized Painted Frame Box Steel Used Layher Scaffolding Price for Sale
Negotiable
100 Pieces(MOQ)
Shoring Galvanized Painted Box Frame Steel Used Layher Scaffolding Price for Sale
Negotiable
100 Pieces(MOQ)
Ringlock Shoring Pipe Frame System Scaffolding System
US$3.00-20.00
100 Pieces(MOQ)
Shoring H Galvanized Painted Steel System Box Frame Scaffolding
Negotiable
100 Pieces(MOQ)
Galvanized H Frame Scaffolding Steel Shoring System for Construction Factory Direct
US$12.00-18.00
500 Pieces(MOQ)
Galvanized Steel Scaffolding System Ringlock/ Cuplock/ Kwikstage Scaffolding
US$5.00-30.00
100 Pieces(MOQ)
Layher Shoring Galvanized Painted Box Steel Used Frame Scaffolding Price for Sale
Negotiable
100 Pieces(MOQ)
CE SGS Kwikstage Shoring Prop Cuplock Frame Ringlock Scaffolding System for Construction
US$1,100.00-1,200.00
5 Tons(MOQ)
Cuplock Ringlock Kwikstage Shoring Pipe Frame System Scaffolding
US$3.00-20.00
100 Pieces(MOQ)
En12811 Certified Ringlock Cuplock Kwikstage Shoring Pipe Frame Scaffold & Scaffolding System Construction
US$3.00-20.00
100 Pieces(MOQ)
Professional Hot Dipped Galvanized Metal Frame Scaffold Construction Australia Steel Kwikstage Scaffolding System for Sale
US$1,120.00-1,250.00
49 Tons(MOQ)
Kwikstage Shoring Pipe Frame System Scaffolding for Standards Scaffold Sale
US$2.80-13.69
500 Pieces(MOQ)
Layher Cuplock Aluminum Kwikstage Plettac Shoring Frame Ringlock Scaffolding System
Negotiable
5 Tons(MOQ)
Ringlock Cuplock Kwikstage Frame System Scaffolding Parts Suppliers
US$1.00-5.00
50 Pieces(MOQ)



















